Laserfiche WebLink
Operator Skill: <br />0.750 <br />Material consistency: <br />0.900 <br />Dozing method: <br />1.000 <br />Visibility: <br />0.800 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />1.000 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.868 <br />Blade type: <br />1.000 <br />Net correction: 0.3112 <br />Adjusted unit <br />1,428.25 LCY/hr <br />production: <br />Adjusted fleet <br />production: 1428.25 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.316/LCY <br />Total job time: 1.72 Hours <br />Total job cost: $779 <br />(AVG.) <br />(CAT HB)) <br />(GEN.) <br />(POOR) <br />1 SHIFT/DAY) <br />(FND-RF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PA' <br />