Laserfiche WebLink
BULLDOZER WORK <br />Task description: Sidehill Pond Removal <br />Site: Colowyo Coal Mine <br />PROJECT IDENTIFICATION <br />Permit Action: 13C (TR118) Permit/Job#: C1981019 <br />Task #: 021 State: Colorado <br />Date: 3/13/2018 County: Moffat <br />User: ZTT <br />Agency or organization name <br />DRMS <br />Abbreviation: None <br />Filename: C019-021 <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat Dl lT - 11U <br />Horsepower: 850 <br />Blade Type: Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$226.13 <br />NA <br />Operating Cost/Hour: <br />$183.90 <br />100 <br />Ripper own. <br />Cost/Hour: <br />$0.00 <br />NA <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$41.85 <br />NA <br />Total unit Cost/Hour: $451.88 <br />Total Fleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 19,800 <br />Swell factor: 1.125 <br />Loose volume: 22,275 LCY <br />Source of estimated volume: Exh 7,Item 23,Fig. C5 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 120 feet <br />Unadjusted hourly 2,467.4 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push 0% <br />gradient: <br />Average site altitude: <br />Material weight: <br />6,900 feet <br />2.650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />