My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-03_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-05-03_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2018 6:37:05 AM
Creation date
5/7/2018 7:04:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
5/3/2018
Doc Name
Cumulative Bond Schedule
Section_Exhibit Name
Exhibit 13C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Scraper Push Dozer Source <br />Altitude Adj: 1.000 NA (CAT HB) <br />Job Efficiency: 0.830 NA (CAT HB) <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Hard, smooth, stabilized, surfaced, watered maintained 2.0 <br />Haul Route: <br />Site Altitude: 7500 feet <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res Velocity <br />(%) (fpm) <br />Travel Time <br />(min) <br />1 <br />2650.00 <br />2.00 <br />2.00 <br />4.00 2394 <br />1.27 <br />Haul Time: 1.27 minutes <br />Return Rnute- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity <br />(fpm) <br />Travel Time <br />(nun) <br />1 <br />2650.00 <br />-2.00 <br />2.00 <br />0.00 <br />2965 <br />1.00 <br />Return Time: <br />1.00 <br />minutes <br />Total Scraper team cycle time: <br />3.87 <br />minutes <br />Adjusted for job conditions: <br />746.36 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />746.36 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />2,985.43 <br />LCY/Hour <br />Unadjusted unit production/hour: 899.22 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 4 Team(s) Total job time: <br />37.53 Hours <br />Unit cost: $1.511 /LCY Total job cost: $1692345 <br />
The URL can be used to link to this page
Your browser does not support the video tag.