Laserfiche WebLink
COLORADO <br />Division of Reclamation, <br />j&7 Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />May 3, 2018 <br />Foidel Creek Mine, C-1982-056 <br />Adequacy Review RN7 <br />Questions 22 and 47 <br />Tabetha, <br />I have finished my review of Questions 22 and 47 as requested. If you have any <br />questions, please let me know. <br />22. Item Resolved <br />47. It is not clear from the provided information in the permit what the final topsoil depth will be <br />after reclamation. In TC's March 27, 2018 response, they stated "if the stockpiled soil materials <br />are associated with a specific disturbance area, all available stockpiled material will be <br />replaced on that area, with reasonable efforts to replace the soils at a uniform thickness. " <br />Please clarify the association of each stockpiled soil materials to a specific disturbance area as <br />this information is not currently in the permit (this information was once provided on the <br />6/28/2006 version of Map 29). Also include what the uniform thickness is proposed to be for <br />each disturbed area based on the stockpiled soil materials associated with that area. <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper, Governor I Robert W. Randall, Executive Director I Virginia Brannon, Director <br />flF'C-0 <br />H <br />I <br />'F1876 <br />