Laserfiche WebLink
r <br /> STATE CIF COLORADO <br /> OFFICE OF THE STATE ENGINEER <br /> Division of Water Resources +� <br /> Department of Natural Resources <br /> 1313 Sherman Street,Room 818 * ; <br /> Denver Colorado 80203 is <br /> Phone(303)866-3581 <br /> FAX 003)866-3589 Bin 0%*M <br /> wwwwatecstate.co.us Governor <br /> Russetl George <br /> Response to Reclamation Permit Application Consideration Executive Director <br /> Hal 0.Simpson,P.E. <br /> State Engineer <br /> DATE: February 7,2006 <br /> TO: Berhan M.Keffeiew,Environmental Protection Specialist <br /> CC: Division 2 Office;Dis ct 79 Water Commissioner ED <br /> FROM: Don West,P.E. O �' RECErV <br /> RE: Pots No 2 Pit,File No.M-2006-013 4/ <br /> Operator:Eastern Colorado Aggregates <br /> Contact:Ronda Neumeister 719/537-0117 —"'Division of Minerals and Geology <br /> Section 4,Twp 27S,Rng 66W,6th P.M.,Huerfano County <br /> CONDITIONS FOR APPROVAL <br /> ® The proposed operation does not anticipate exposing groundwater. Therefore,exposure of ground <br /> water must not occur during or after mining operations. If stormwater is contained on-site,it must <br /> infiltrate into the ground or be released to the natural stream system within 72 hours,or all work <br /> must cease until a substitute water supply plan,or augmentation plan approved by water court,is <br /> obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br /> unless an augmentation plan approved by water court is obtained. <br /> ❑ The proposed operation will consume ground water by: ❑evaporation,❑dust control, <br /> ❑reclamation,❑water removed in the mined product,❑processing,❑other:. <br /> Prior to initiation of these uses of ground water,the applicant will need to obtain either a gravel pit <br /> or other type of well permit, as applicable. However,prior to obtaining a permit,an approved water <br /> supply plan or decreed plan for augmentation is required. <br /> ❑ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br /> document the locations of all wells within 600 feet of the permit area. The applicant must then <br /> obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br /> request a hearing before the State Engineer. <br /> ❑ Other: <br /> COMMENTS: <br />