Laserfiche WebLink
Knight Piiesold <br /> CONSULTING <br /> Table 4.1 <br /> Cripple Creek and Victor Gold Mining Co. (Newmont) <br /> Cripple Creek and Victor Mine <br /> Stormwater Management Plan Evaluation <br /> Modified EMP 22 Spillways 100-year/24-hour Storm Event Peak Flows <br /> Global Summary Results for Run"100yr/'24hr-Spillways" <br /> Project:CCV SitewideModel_Design Simulation Run:100yr/24hr-Spillways <br /> Start of Run: 07Mar2018,00:00 Basin Model: Spillways <br /> End of Run: O8Mar2O 18,00:10 Meteorologic Model: 100yr/24hr <br /> Compute Time:19Apr2018, 16:24:43 Control Specifications:24hr <br /> Show Elements: All Elements Volume Units: 0 IN @)AC-FT Sorting: Hydrologic .. <br /> Hydrologic Drainage Area Peak Discharge Time of Peak Volume <br /> Element (MI2) (CFS) (AC+-O <br /> SB-EMP22-1 0.0326 11.6 07Mar2018, 12:20 1.7 n <br /> EMP22-1 0.0003 0.8 07Mar2018, 12:00 0.1 <br /> EMP22-1-Spillway 0.0329 11.0 07Mar2018, 12:20 1.8 <br /> SB-EMP22-2 0.0349 11.4 07Mar2018, 12:20 1.9 <br /> EMP22-2 0.0005 1.4 07Mar2018, 12:00 0.1 <br /> EMP22-2-Spillway 0.0354 10.5 07Mar2018, 12:30 2.0 v <br /> Note: <br /> 1. SB: Sub-basin <br />