Laserfiche WebLink
Knight Piesold <br /> CONSULTING Table2.4 <br /> Cripple Creek and Victor Gold Mining Co.(Newmont) <br /> Cripple Creek and Victor Mine <br /> Stormwater Management Plan Evaluation <br /> Existing Diversion Channels 100-year/24-hour Storm Event Evaluation <br /> Diversion Channel <br /> Parameter <br /> DC-EMPBb <br /> Cross-section number ) 6 D - DC EMP17b 8N D. - <br /> As-built longitudinal slope(%),S 10.0 4.8 23.0 3.6 1.5 0.5 10.0 27.9 23.9 <br /> As-built bottom width(ft),Bf 23.0 10.3 5.5 5.3 1.7 4.0 3.8 4.0 3.0 <br /> As-built side-slope(xH:1 V),Z 2.1 2.8 3.0 3.2 2.3 1.5 2.0 1.9 2.0 <br /> As-built channel depth(ft),Dc 4.0 2.8 2.6 1.0 3.6 2.8 2.4 1.5 1.6 <br /> As built freeboard depth(ft),Dfb 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 <br /> As-built allowable normal flow depth(ft),Dn 3.0 1.8 1.6 0.0 2.6 1.8 1.4 0.5 0.6 <br /> As-built riprap median diameter(in),D50 3 3 6 9 3 9 <br /> As-built Manning's roughness(),n 0.03 0.04 0.04 0.04 NA 0.04 NA NA 0.10 <br /> As-built riprap safety factor(-),SF 0.26 0.33 0.35 2.68 NA 4.05 NA NA 0.70 <br /> As-built flow capacity(cfs),Qab 2,300 300 250 0 111 39 103 31 12 <br /> 100-year/24-hour flow rate(cfs),0100/24 131 131 57 10 36 9 8 7 25 <br /> Capacity-Sufficient or Insufficient Sufficient Sufficient Sufficient I Sufficient Sufficient Sufficient Sufficient <br /> Riprap D50-Sufficient or Insufficient I Sufficient Sufficient <br /> Notes: <br /> 1.Capacity is deemed sufficient if the as-built flow capacity is equal to or greater than the 100-year/24-hour flow rate.Otherwise,insufficient. <br /> 2.Riprap D50 is deemed sufficient if the as-built riprap safety factor is equal to or greater than 1.2 for the 100-year/24-hour flow rate.Otherwise,insufficient. <br />