Laserfiche WebLink
Knight Piesold <br /> CONSULTING <br /> Environmental Department, Meg Burt, Senior Manager April 27, 2018 <br /> Cripple Creek and Victor Gold Mining Co. (Newmont) <br /> 4.3 Civil Design <br /> The designs presented on Drawings 000 through 215 were completed to an FS-level and are not for <br /> construction. The pertinent design data are presented on the drawings themselves via tables and notes. <br /> The existing impoundment is denoted as EMP-22 on the design drawings. The new second <br /> impoundment, located downstream of EMP-22 and denoted as EMP-22b, has been designed to be <br /> constructed entirely in cut with side slopes of 2.OH:1.OV. Plan and profile views of EMP-22/22b are <br /> presented on Drawing 200. <br /> The new spillway connecting EMP-22 to EMP-22b is also designed to be constructed entirely in cut. The <br /> spillway is to be constructed and lined with riprap and nonwoven geotextile to the bottom of EMP-22b to <br /> prevent erosion in the spillway and on the impoundment slopes. Plan and profile views of the upstream <br /> spillway, along with a design cross section is presented on Drawing 210. <br /> The new spillway connecting EMP-22b to the downstream environment, designed entirely in cut, will be <br /> located at the northwest corner of the EMP-22b impoundment. The spillway will discharge into an existing <br /> channel that serves as a bypass to reduce the contributing area to EMP-22. The entirety of the spillway is <br /> to be lined with riprap and nonwoven geotextile. The plan, profile, and design cross section are presented <br /> on Drawing 215. <br /> 5.0 CLOSING REMARKS <br /> This document presents Knight Piesold's final SWMP evaluation findings and the required design <br /> upgrades to EMP 22. By way of summary, Knight Piesold will develop and provide CC&V the following <br /> additional FS-level design upgrades, per Table 3.1: <br /> • Diversion channels: <br /> — DC-EMP8a(new-capacity and riprap) <br /> — DC-EMP8b(riprap,which may affect capacity) <br /> — DC-EMP13(riprap,which may affect capacity) <br /> — DC-EMP16(capacity) <br /> — DC-EMP17a (absent - riprap, which may affect capacity), which will also serve as the spillway for <br /> EMP 16 <br /> — DC-EMP18N (absent-riprap,which may affect capacity) <br /> — DC-EMP18W(capacity and riprap) <br /> — DC-EMP20N (absent-riprap,which may affect capacity) <br /> — DC-EMP20S (capacity and riprap) <br /> • Spillways: <br /> — EMP 6(outlet channel [i.e., chute]capacity and riprap),two spillways in series required <br /> — EMP 8a(absent-inlet weir, chute capacity, and riprap) <br /> — EMP 8b(inlet weir and chute capacity) <br /> — EMP 9a-d (absent-inlet weirs,chute capacities, and riprap), four spillways in series required <br /> — EMP 13(absent-inlet weir, chute capacity, and riprap),two spillways in series required <br /> — EMP 16(chute riprap, which may affect capacity),which will be DC-EMP17a <br /> — EMP 17(absent-inlet weir, chute capacity, and riprap) <br /> — EMP 17a(chute capacity and riprap) <br /> — EMP 17b(chute capacity) <br /> — EMP 18(absent-inlet weir, chute capacity, and riprap) <br /> 10 <br />