Laserfiche WebLink
PART I <br />Page 19 of 56 <br />C00032115 <br />ALTERNATE LIMITATIONS <br />Any discharge or increase in the volume of a discharge is caused by precipitation within any 24-hour period less than or <br />equal to the 10 -year, 24-hour precipitation event (or snowmelt of equivalent volume) may comply with alternate <br />limitations subject to burden of proof requirements as described in the EFFLUENT LIMITATIONS AND MONITORING <br />REQUIREMENTS section. <br />The following limits for Fe(TR) and Settleable Solids may be substituted for the Fe(TR) and TSS limitations contained in <br />the previous table. All other parameters remain unchanged. <br />Alternate Limits Outfalls 001, 009, 018, 022, 026 and 027 (less than or equal to the 10 -year, 24-hour <br />precipitation event) <br />ALTERNATE LIMITATIONS <br />Any discharge or increase in volume of a discharge caused by precipitation within any 24-hour period greater than the <br />10 -year, 24-hour event (or series of storms or snowmelt of equivalent volume) may comply with alternate limitations <br />subject to burden of proof requirements as described in the EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />section. <br />The following limit for Fe(TR) may be substituted for that contained in the previous table. TSS and Settleable Solids <br />monitoring/ effluent limitations are not required. All other parameters remain unchanged. <br />Alternate Limits Outfalls 001, 009, 018, 022, 026 and 027 (greater than the 10 -year, 24-hour precipitation event) <br />Effluent Limitations Maximum <br />Monitoring Requirements <br />ICIS <br />Effluent Parameter <br />Concentrations <br />30 -Day <br />7 -Day <br />Dail <br />Frequency <br />Sample Type <br />Code <br />Average <br />Avera a <br />Maximum <br />00980 <br />Fe, TR (pg/1) <br />1000 <br />Report <br />Monthly <br />Grab <br />00545 <br />Settleable Solids(ml/l) <br />Report <br />0.5 <br />Monthly <br />Grab <br />ALTERNATE LIMITATIONS <br />Any discharge or increase in volume of a discharge caused by precipitation within any 24-hour period greater than the <br />10 -year, 24-hour event (or series of storms or snowmelt of equivalent volume) may comply with alternate limitations <br />subject to burden of proof requirements as described in the EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />section. <br />The following limit for Fe(TR) may be substituted for that contained in the previous table. TSS and Settleable Solids <br />monitoring/ effluent limitations are not required. All other parameters remain unchanged. <br />Alternate Limits Outfalls 001, 009, 018, 022, 026 and 027 (greater than the 10 -year, 24-hour precipitation event) <br />2. Narrative Water Quality Based Effluent Limitation (Outfalls 001, 005, 008, 009, 013, 014, 015, 016, 018, <br />019, 022, 024, 026, 027) <br />Discharges authorized under this permit must be controlled as necessary to meet applicable water quality <br />standards. <br />The division expects that compliance with the other terms and conditions in this permit will control discharges as <br />necessary to meet applicable water quality standards. If at any time the permittee becomes aware, or the division <br />determines, that the authorized discharge causes or contributes to an exceedance of applicable water quality <br />standards, the permittee must take corrective action as required, document the corrective actions as required, <br />and report the corrective actions to the Division as required (see CORRECTIVE ACTIONS). <br />If the division becomes aware of information indicating that compliance with the other terms and conditions of this <br />permit will not control the discharge as necessary to meet applicable water quality standards, the division may <br />include additional site-specific water quality -based effluent limitation(s) to the discharge. <br />3. Federal Effluent Limitation Guideline - Sediment Control Plan (Outfalls 005, 008, 013, 014, 015, 016, 019, <br />024) <br />ICIS I Description Due date Frequency <br />Code <br />Effluent Limitations Maximum <br />Monitoring Requirements <br />ICIS <br />Effluent Parameter <br />Concentrations <br />0 -Da <br />7 -Day <br />Daily <br />Frequency <br />Sample Type <br />Code <br />Average <br />Avera a <br />Maximum <br />00980 <br />Fe, TR (pg/l) <br />1000 <br />Report <br />Monthly <br />Grab <br />2. Narrative Water Quality Based Effluent Limitation (Outfalls 001, 005, 008, 009, 013, 014, 015, 016, 018, <br />019, 022, 024, 026, 027) <br />Discharges authorized under this permit must be controlled as necessary to meet applicable water quality <br />standards. <br />The division expects that compliance with the other terms and conditions in this permit will control discharges as <br />necessary to meet applicable water quality standards. If at any time the permittee becomes aware, or the division <br />determines, that the authorized discharge causes or contributes to an exceedance of applicable water quality <br />standards, the permittee must take corrective action as required, document the corrective actions as required, <br />and report the corrective actions to the Division as required (see CORRECTIVE ACTIONS). <br />If the division becomes aware of information indicating that compliance with the other terms and conditions of this <br />permit will not control the discharge as necessary to meet applicable water quality standards, the division may <br />include additional site-specific water quality -based effluent limitation(s) to the discharge. <br />3. Federal Effluent Limitation Guideline - Sediment Control Plan (Outfalls 005, 008, 013, 014, 015, 016, 019, <br />024) <br />ICIS I Description Due date Frequency <br />Code <br />