Laserfiche WebLink
i 1 <br /> 7200 7200 <br /> l <br /> EM8 WENT ES <br /> 7774" <br /> 7170 7170 <br /> , <br /> � r <br /> z 1 <br /> 7110o � 7110 <br /> rn <br /> O N N N M M co M 7 V 7 b LO Ln cc <br /> j PROFILE THROUGH IMPOUNDMENT <br /> SCALE 1" =50' Profile Impoundment <br /> Topography Premine <br /> ' <br /> 1 <br /> Op <br /> , <br /> r <br /> r 1 <br /> : <br /> ; <br /> r , <br /> I <br /> EMBANKMENT DETAILS <br /> ` Scale 1" = 20' <br /> i t <br /> UPSTREAM DOWNSTREAM <br /> 8 inch di CMP + EMBANKMENT CREST <br /> 7174.0 <br /> WALKWAY W 42 HANDRAILS AS SPECIFIED <br /> 7j drains to 1 lower Ditch - PRINCIPAL SPILLWAY WITH NCRS ANTI-VpRTEX TRASH RACK,EL 7170.0 <br /> 2 RISER IS 18"DIA. GALV STEEL CMP, 14 GAUGE MIN. o' <br /> TWO 3"DIA.PERFORATIONS AT EL. 7167.0 <br /> f EMERGENCY SPILLWAY,EL, 7172.0(BOTTOM OF RIPRAP) <br /> 0 NORMAL POOL <br /> . # EL. 7T� EL. 7161.1 i <br /> 1 NRL sOMP Rise I i FLOW TO DITCH of LOWER <br /> ONE YEAR SEDIMENT ACCUMULATION, EL. 7157.3 EL. 7155.0 <br /> �. - POND BOTTOM <br /> ' ins D5 Rlpsap 'i _ EL. 7155.0 ANTISEEP COLLARS 6 FT(MIN) <br /> �- 7 i installe in Spillway TWO REQUIRED ON 20 FT CENTERS <br /> , <br /> N1 . <br /> 18"0 GALV STEEL CMP, 14 GAUGE MINIMUM,'0 <br /> : <br /> II� <br /> f , <br /> Acceptable Fill Materials: <br /> Suitable fill materials can be obtained from pond excavations or from nearby borrow sources. Suitable materials include native clay soils, clayey sand soils, and bedrock materials which are broken down to these soil types (SC, CC, CL and CH). <br /> Bedrock materials should be processed to produce a soil like material with maximum particle size of 6 inches. The materials used as embankment fill should have at least 25 percent fines (material finer than No. 200 sieve). The field engineer may <br /> i <br /> approve the use of other materials following appropriate laboratory testing. <br /> Unacceptable Fill Materials: <br /> Materials not considered suitable for use as embankment fill include cleaner sand and gravel. Also unacceptable are highly carbonaceous materials obtained from bedrock excavations or well-cemented sandstones which do not break down to soil like material. <br /> Highly organic soils or materials containing construction debris are also not acceptable. Frozen soil is not acceptable. <br /> Fill Placement and Compaction: <br /> Embankment fill should be placed in thin horizontal lifts (8 to 12 inches loose thickness). The fill should be moisture conditioned to within 2 percent of optimum moisture content and compacted to at least 95 percent of standard proctor maximum dry density <br /> (ASTM D 698). The placing and spreading of fill materials should be started at the lowest point of the embankment. Fill placement and compaction should be observed and tested by qualified geotechnical engineering firm. <br /> - Construction Notes: <br /> 1. See Map 41B for general location and associated drainage areas. <br /> 2. Embankment to be constructed of compacted fill using materials specifed by field engineer. Refer to <br /> to Exhibit 7, Item 20, Part F for Geotechnical Information and compaction specifications. Figure 3 of <br /> that document contains requirements for site preparation, fill materials,placement requirements, and <br /> monitoring. <br /> 3. Hatched area of the spillway shall be riprapped with 12 inch D50 size material. <br /> N AREA-CAPACITY TABLE <br /> (To be revised following as-built survey) PRECEIVED <br /> ELEVATION AREA AVERAGE AREA CAPACITY <br /> INCREMENTAL CUMULATIVE i° Q1E <br /> (Feet) (Acres) (Acres) (Acre-Feet) (Acre-Feet) <br /> W E i_.rsion of Reclamation, <br /> 7155.0 0. 155 0.00 ENGINEERS CERTIFICATION Mining&Safety <br /> 0. 17 0. 17 I, LEE E. SAMPSON, hereby certify that this <br /> ma has been reviewed b me and is true <br /> 7156.0 0. 179 0.21 0.41 0. 17 and correct to the best of my knowledge and TR-118 <br /> S information, relying on information supplied Approved 4/2/18 <br /> f 7158.0 0.232 0.58 by experts employed by Colowyo Coal <br /> 0.26 0.52 Company or qualified consultants working <br /> 7160.0 0.292 1. 10 for Colowyo Coal Company, and that I am a <br /> Professional Engineer licensed in Colorado as <br /> 0.33 0.65 <br /> required by the provisions of C.R.S. <br /> Idehlll Pond - Plan View 7162.0 0.359 1. 75 12-25-101 through C.R.S. 12-25-119. IN SIDEHILL IMPOUNDMENT <br /> Scale 1" = 50' 0.40 0. 79 WITNESS WHEREOF, 1 have hereunder set <br /> 7164.0 0.433 2.54 my hand and affixed my seal. DESIGN DRAWING <br /> 0.47 0.95 <br /> 7166.0 0.514 3.49 ,,,,�Q111IIIA(/ 0 DATES: 1-11-As 8d <br /> 0.56 1. 11 0` P° DRWG BY: I FR <br /> 7168.0 0.601 4.60 `° <br /> LOP) COAL APPROVED BY: <br /> 0.64 1.28Fe>COMPANY a� DRWG NO. <br /> 7170.0 0.674 5.88 = U : v - Colowyo <br /> 47031 = Exh. 7, Item 23 <br /> °'ao"°"°°° Figure C5 <br /> 7172.0 0. 794 0. 73 1.47 7 35 : �� ., z-�Z-,y;• �� c 5eaksia,eH9do 64 <br /> •, , Meeker,Cdom 8113 <br /> i��',,,!I���U�� `,, No. REVISION DATE BY CHK <br /> TOTAL CAPACITY 7.35 ACRE-FEET (DESIGN) <br /> TR-118 Removed Gate Valve,Modified Pond Specs 1119118 LES JG <br /> TR-118 Revised Emergency Spillway Elevation 2112118 Tony LES <br /> Page Exh. 7-23C-10 <br />