Laserfiche WebLink
EXHIBIT 13C <br />CUMULATIVE BOND SCHEDULE <br />Introduction <br />In accordance with Rules 3.02.1(5)(b) and 3.02.1(6), Exhibit 13C presents a cumulative bond <br />schedule for the reclamation of the Collom Haul Road, the Collom facilities area, the primary <br />sediment control structures, raw water pipeline, access roads, Collom Pit Haul Road, topsoil <br />removal for the Collom box cut and temporary spoil pile, overburden removal and storage for the <br />Collom box cut and temporary spoil pile, and construction of the primary crusher and other <br />mining related structures at the Collom operation. Please see Map 13C-1 Sheets 1 and 2 for <br />areas outlined in this cumulative bond schedule. <br />Volume 20 Page 1 Revision Date: 3/23/18 <br />Revision No.: TR -118 <br />