Laserfiche WebLink
Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />0.903 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.793 <br />Blade type: <br />1.000 <br />Net correction: <br />0.3851 <br />Adjusted unit 350.63 LCY/hr <br />production: <br />Adjusted fleet 350.63 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: I Dozer(s) <br />Unit cost: $0.742/LCY <br />Total job time: 30.76 Hours <br />Total job cost: $8,006 <br />(1 SHIFT/DAY) <br />(FND-RF) <br />T H; <br />T H] <br />.T H1 <br />'AT) <br />