My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-04-02_PERMIT FILE - C1981019A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-04-02_PERMIT FILE - C1981019A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2018 6:29:30 AM
Creation date
4/25/2018 8:44:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
4/2/2018
Doc Name
Pages EX13A-TO-1 to EX13A-T18B-2
Section_Exhibit Name
Exhibit 13A Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HYDRAULIC EXCAVATOR WORK <br />Task description: Excvt Regraded Areas for PM Drng. Channels (sub. SL7 & 8) <br />ite: Colowyo Coal Mine Permit Action: MT7 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 065 <br />Date: 4/8/2016 <br />User: JHB <br />State: Colorado <br />County: Moffat <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 336D L 10'-6" Stick <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $44.13 NA <br />Operating Cost/Hour: $74.06 100 <br />Operator Cost/Hour: $35.36 NA <br />Total Unit Cost/Hour: $153.55 <br />Total Fleet Cost/Hour: $153.55 <br />MATERIAL OUANTITIES <br />Abbreviation: None <br />Filename: C019-065 <br />Horsepower: <br />268 <br />Weight (MT): <br />29.30 <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Initial volume: 227,242 CCY Swell factor: 1.000 <br />Loose volume: 227,242 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket, swing loaded, dump bucket, swingy empty): <br />Basic Job Condition Description: <br />Secondary Job Condition within Basic Description: <br />Cycle Time Value: <br />Load Bucket Capacity <br />Rated Capacity: 2.26 <br />Bucket Fill Factor: 0.875 <br />Adjusted Capacity: 1.98 <br />Job Condition Correction Factors <br />AVERAGE <br />AVERAGE <br />0.321 minutes <br />Bucket Size Class: Medium <br />LCY (heaped) <br />Blasted rock - well blasted (80 - 95%) 0.875 <br />LCY <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />Site Altitude: 8100 feet <br />369.63 <br />306.79 <br />306.79 <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Excavator Total job time: 740.71 Hours <br />Unit cost: $0.501 /LCY <br />Total job cost: $113,736 <br />
The URL can be used to link to this page
Your browser does not support the video tag.