Laserfiche WebLink
Task description: <br />.ite: Colowyo Coal Mine <br />BULLDOZER WORK <br />Finish Grade Gossard Loadout <br />PROJECT IDENTIFICATION <br />Task #: 055 <br />Date: 4/5/2016 <br />User: JHB <br />Permit Action: MT7 <br />State: Colorado <br />County: Moffat <br />Agency or organization name: DRMS <br />Permit/Job#: C1981019 <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat DI IT - I IU <br />Horsepower: 850 <br />Blade Type: Universal <br />Attachment: 1 -shank ripper <br />Shift Basis: I per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$194.10 <br />NA <br />Operating Cost/Hour: <br />$291.79 <br />100 <br />Ripper op. Cost/Hour: <br />$16.70 <br />100 <br />Operator Cost/Hour: <br />$38.89 <br />NA <br />Total unit Cost/Hour: $541.47 <br />Total Fleet Cost/Hour: $2,165.89 <br />MATERIAL QUANTITIES <br />Initial Volume: 3,500 <br />Swell factor: 1.000 <br />Loose volume: 3,500 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />2,870.3 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 0% <br />Average site altitude: 7,600 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.900 AB.AVG.) <br />Material consistency: 1.000 CAT HB <br />Dozing method: 1.000 GEN. <br />Visibility: 1.000 AVG. <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 1.000 (DOZ-OC) <br />Abbreviation: None <br />Filename: C019-055 <br />