Laserfiche WebLink
BULLDOZER WORK <br />Task description: Finish Grade Facilities Area <br />ite: Colowyo Coal Mine <br />PROJECT IDENTIFICATION <br />Task #: 053 <br />Date: 4/4/2016 <br />User: JHB <br />Permit Action: MT7 <br />State: Colorado <br />County: Moffat <br />Agency or organization name <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat Dl IT - I IU <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />DRMS <br />Permit/Job#: C1981019 <br />MATERIAL QUANTITIES <br />Initial Volume: 92,500 <br />Swell factor: 1.000 <br />Loose volume: 92,500 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />2,870.3 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 0% <br />Average site altitude: 7,600 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: <br />0.900 (AB.AVG.; <br />Utilization % <br />Ownership Cost/Hour: <br />$194.10 <br />NA <br />Operating Cost/Hour: <br />$291.79 <br />100 <br />Ripper op. Cost/Hour: <br />$16.70 <br />100 <br />Operator Cost/Hour: <br />$38.89 <br />NA <br />Total unit Cost/Hour: <br />$541.47 <br />Total Fleet Cost/Hour: <br />$2,165.89 <br />MATERIAL QUANTITIES <br />Initial Volume: 92,500 <br />Swell factor: 1.000 <br />Loose volume: 92,500 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />2,870.3 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 0% <br />Average site altitude: 7,600 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: <br />0.900 (AB.AVG.; <br />Material consistency: <br />1.000 <br />CAT HB <br />Dozing method: <br />1.000 <br />GEN. <br />Visibility: <br />1.000 <br />AVG. <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DA <br />Spoil pile: <br />1.000 <br />(DOZ-OC) <br />Abbreviation: None <br />Filename: C019-053 <br />