Laserfiche WebLink
BULLDOZER WORK <br />Task description: Regrade Gossard Loadout Road <br />ite: Colowyo Coal Mine Permit Action: MT7 Penmit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 042 <br />Date: 3/25/2016 <br />User: JHB <br />State: Colorado <br />County: Moffat <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Job Condition Correction Factor <br />Basic Machine: Cat DI IT - I IU <br />Operator Skill: <br />0.900 <br />Horsepower: 850 <br />Material consistency: <br />0.900 <br />Blade Type: Universal <br />Dozing method: <br />1.000 <br />Attachment: 1 -shank ripper <br />Visibility: <br />1.000 <br />Shift Basis: 1 per day <br />Job efficiency: <br />0.830 <br />Data Source: (CRG) <br />Spoil pile: <br />1.000 <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$194.10 <br />NA <br />Operating Cost/Hour: <br />$291.79 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.89 <br />NA <br />Total unit Cost/Hour: $524.78 <br />Total Fleet Cost/Hour: $2,099.10 <br />MATERIAL QUANTITIES <br />Initial Volume: 9,700 <br />Swell factor: 1.000 <br />Loose volume: 9,700 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />100 feet <br />2,870.3 LCY/hr <br />Compacted fill or embankment 0.9 <br />0% <br />7,600 feet <br />2,900 lbs/LCY <br />Abbreviation: None <br />Filename: C019-042 <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.900 <br />(AB.AVG. <br />Material consistency: <br />0.900 <br />CAT HB <br />Dozing method: <br />1.000 <br />GEN. <br />Visibility: <br />1.000 <br />AVG. <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />1.000 <br />(DOZ-OC) <br />