Laserfiche WebLink
Haul Route: <br />Seg # <br />Haul Distance <br />Grade (%) Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />min <br />1 <br />9000.00 <br />2.50 3.00 <br />5.50 <br />1266 <br />7.251 <br />Haul Time: 7.251 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res Velocity <br />Travel <br />(Ft) <br />N <br />(%) (fpm) <br />Time <br />min <br />1 <br />9000.00 <br />-2.50 <br />3.00 <br />0.50 3503 <br />2.790 <br />Return Time: 2.790 minutes <br />Total Truck Cycle Time: 13.521 minutes <br />Loading Tool unit <br />Production 4,603.46 LCY/Hour Adjusted for job efficiency: 3,820.87 LCY/Hour <br />Truck Unit Production <br />776.15 LCY/Hour Adjusted for job efficiency: 644.20 LCY/Hour <br />Optimal No. of Trucks: 6 Truck(s) Selected Number of Trucks: 8 Truck(s) <br />Adjusted hourly truck team production: 5,153.63 LCY/Hour <br />Adjusted single truck/loader team production: 3,820.87 LCY/Hour <br />Adjusted multiple truck/loader team production: 7,641.74 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) <br />Unit cost: $1.259 /LCY <br />Total job time: 2,907.47 Hours <br />Total job cost: $27,979,105 <br />