My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-04-02_PERMIT FILE - C1981019A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-04-02_PERMIT FILE - C1981019A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2018 6:29:30 AM
Creation date
4/25/2018 8:44:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
4/2/2018
Doc Name
Pages EX13A-TO-1 to EX13A-T18B-2
Section_Exhibit Name
Exhibit 13A Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Haul Route: <br />Seg # <br />Haul Distance <br />Grade (%) Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />min <br />1 <br />9000.00 <br />2.50 3.00 <br />5.50 <br />1266 <br />7.251 <br />Haul Time: 7.251 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res Velocity <br />Travel <br />(Ft) <br />N <br />(%) (fpm) <br />Time <br />min <br />1 <br />9000.00 <br />-2.50 <br />3.00 <br />0.50 3503 <br />2.790 <br />Return Time: 2.790 minutes <br />Total Truck Cycle Time: 13.521 minutes <br />Loading Tool unit <br />Production 4,603.46 LCY/Hour Adjusted for job efficiency: 3,820.87 LCY/Hour <br />Truck Unit Production <br />776.15 LCY/Hour Adjusted for job efficiency: 644.20 LCY/Hour <br />Optimal No. of Trucks: 6 Truck(s) Selected Number of Trucks: 8 Truck(s) <br />Adjusted hourly truck team production: 5,153.63 LCY/Hour <br />Adjusted single truck/loader team production: 3,820.87 LCY/Hour <br />Adjusted multiple truck/loader team production: 7,641.74 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) <br />Unit cost: $1.259 /LCY <br />Total job time: 2,907.47 Hours <br />Total job cost: $27,979,105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.