Laserfiche WebLink
Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />0.903 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.793 <br />Blade type: <br />1.000 <br />Net correction: <br />0.3851 <br />Adjusted unit 350.63 LCY/hr <br />production: <br />Adjusted fleet 350.63 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.742/LCY <br />Total job time: 38.23 Hours <br />Total job cost: $9,948 <br />I SHIFT/DA <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />