Laserfiche WebLink
2.05.3 (3) <br />Mine Facilities........................................................................................................... 95 <br />2.05.3 (4) <br />Operation Plan — Ponds, Impoundments, and Diversions.......................................... <br />96 <br />2.05.3 (5) <br />Topsoil....................................................................................................................... <br />96 <br />2.05.3 (6) <br />Overburden................................................................................................................ <br />98 <br />2.05.4(l) <br />Reclamation Plan..................................................................................................... <br />102 <br />2.05.4 (2)(a) <br />Reclamation Timetable............................................................................................ <br />102 <br />2.05.4 (2)(b) <br />Reclamation Costs................................................................................................... <br />103 <br />2.05.4 (2)(c) <br />Backfilling Plan ....................................................................................................... <br />103 <br />2.05.4 (2)(d) <br />Topsoil Salvage........................................................................................................ <br />103 <br />2.05.4 (2) (e) <br />Reclamation Revegetation....................................................................................... <br />104 <br />2.05.4(f-h) <br />Disposal, Mine Openings, Water and Air Control ................................................... <br />104 <br />2.05.5 <br />Post-Mining Land Uses........................................................................................... <br />104 <br />2.05.6 <br />Mitigation of Impacts of Mining Operations........................................................... <br />106 <br />2.05.6(l) <br />Air Pollution Control Plan....................................................................................... <br />106 <br />2.05.6 (2) <br />Fish and Wildlife Plan............................................................................................. <br />106 <br />2.05.6 (3)(a) <br />Protection of the Hydrologic Balance...................................................................... <br />106 <br />2.05.6 (3)(b)(i & <br />ii) Hydrologic Controls................................................................................................ <br />108 <br />2.05.6 (3)(b)(iii) <br />Probable Hydrologic Consequences........................................................................ <br />108 <br />2.05.6 (4) <br />Protection of Public Parks and Historic Places........................................................ <br />120 <br />2.05.6 (5-6) <br />Surface Mining near Underground Mining; Subsidence Control ............................ <br />120 <br />2.06 <br />PERMIT REQUIREMENTS - SPECIAL MINING CATEGORIES ......................... <br />121 <br />2.06.1-3 <br />Scope, Experimental Mining, and Mountain Top Removal.................................... <br />121 <br />2.06.4 <br />Steep Slope Mining.................................................................................................. <br />121 <br />2.06.5 <br />Variance from Approximate Original Contour Restoration Requirements ............. <br />121 <br />2.06.5 (2) (a) Post-Mining <br />Land Use........................................................................................................ <br />121 <br />2.06.5 (2) (b) Consultation with Planning Agencies................................................................................ <br />121 <br />2.06.5 (2) (c) Alternative Postmining Land Uses..................................................................................... <br />121 <br />2.06.5 (2) (d) Watershed <br />Improvements................................................................................................... <br />122 <br />2.06.5 (2) (e) Owner Approval................................................................................................................. <br />122 <br />2.06.5 (2) (f) Compliance with Limited Variances.................................................................................. <br />122 <br />2.06.6 <br />Prime Farmlands...................................................................................................... <br />122 <br />2.06.7 <br />Reclamation Variance........................................................................ ...................... <br />122 <br />2.06.8 <br />Alluvial Valley Floor (AVF)................................................................................... <br />124 <br />2.06.9 <br />Augering and Highwall Mining............................................................................... <br />128 <br />2.06.10-2.06.11 <br />Processing Plants, In-Situ Processing...................................................................... <br />128 <br />2.06.12.1 <br />Coal Refuse Piles..................................................................................................... <br />128 <br />2.07-2.10 <br />VARIOUS................................................................................................................... <br />128 <br />RULE 3 — PERFORMANCE BOND........................................................................................................... <br />1 <br />RULE 4 — PERFORMANCE STANDARDS.............................................................................................. <br />1 <br />4.02 <br />SIGNS AND MARKERS............................................................................................... <br />1 <br />4.02.1 <br />Specifications......................................................................... <br />4.02.2 <br />Mine and Permit Identification Signs.......................................................................... <br />1 <br />4.02.3 <br />Perimeter Markers........................................................................................................ <br />1 <br />4.02.4 <br />Duration of Maintenance............................................................................................. <br />1 <br />4.02.5 <br />Stream Buffer Zone Markers....................................................................................... <br />1 <br />4.02.6 <br />Blasting Signs.............................................................................................................. <br />1 <br />4.02.7 <br />Topsoil Markers........................................................................................................... <br />2 <br />4.03 <br />ROADWAYS.................................................................................................................. <br />2 <br />4.03.1 <br />Haul Roads................................................................................................................... <br />2 <br />4.03.2 <br />Access Roads............................................................................................................... <br />2 <br />4.03.3 <br />Light-Use Roads.......................................................................................................... <br />3 <br />South Taylor/Lower Wilson - ii Revision Date: 10/31/13 <br />Revision No.: MR -129 <br />