My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-20_PERMIT FILE - C1981019A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-03-20_PERMIT FILE - C1981019A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2018 7:38:33 AM
Creation date
4/25/2018 6:42:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
3/20/2018
Doc Name
Volume 1 Rule 4
Section_Exhibit Name
4.02 Throuugh 4.30
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br />These activities are not associated with the mining operation and will only occur outside of the permitted <br />disturbance boundary. Please see Maps 19, 19B, and 19C for the permitted disturbance areas. The <br />construction and/or repairs to these ranch roads will factilitate ongoing private landowner activities <br />including ranching, grazing, hunting, and access for other entities which hold right of ways within the <br />permit boundary. These ranch roads activities are not associated with Colowyo's mining activities, and <br />will not be required to be permitted nor bonded for in accordance with Rule 3.02.1(2). <br />White River Electric Assoication (WREA) will construct, operate, and maintain a 69 kV power line from <br />the Axial Basin substation adjacent to State Highway 13 to the Collom facitlies area. This power line will <br />be wholly owned by WREA. The ground disturbing activities associated with construction of the power <br />line, including pole locations and roads to pole locations, are not associated with Colwoyo's mining <br />activities, and will not be required to be bonded in accordance with Rule 3.02.1(2). The power line will <br />service the area post -mining in Collom. <br />4.13 Contemporaneous Reclamation <br />All reclamation actives, including but not limited to backfilling, grading, topsoil, replacement and <br />revegetation, will be carried out as contemporaneously as practicable with mining operations. <br />Implementation of the reclamation plan, as described in Section 2.05.4, will assure that each step in the <br />reclamation process is completed in a timely manner. <br />Because of the multi -seam nature of the mining operation described in Section 2.05, backfilling and <br />grading cannot be completed within 180 days following the coal removal. Backfilling and grading will be <br />completed in variance of the 180 day requirement in a manner previously approved and described below, <br />and in Sections 2.05 and 4.14.1. As shown on the mining Range Diagram (Map 24), mining will be <br />carried out in any one area for a considerable length of time. A series of benches will be necessary in the <br />operation to recover the lower coal seams, and an additional series of benches will be necessary to dump <br />the shovel/truck overburden material in a configuration that achieves the topography shown on the post - <br />mining Topography Map (Map 19). When multi -seams are mined, backfilling and rough grading cannot <br />begin until the lower-most seam is mined. See Spoil Grading Map (Map 29), which shows the time <br />frames in which grading will occur in relation to the time of removal of "X" seam coal, which is shown <br />on the Mine Plan Map (Map 23). <br />Topsoil will be removed prior to the mining disturbance according to the timetable established on the <br />Topsoil Handling — South Map (Map 28). As can be observed from this map, the initial topsoil removed <br />at the operation must be stockpiled; however, as the operation progresses, topsoil can be immediately <br />redistributed rather than stockpiled. <br />Revegetation will commence as soon as the topsoil has been redistributed and prepared for seeding as <br />described in Section 2.05.4. The area will be seeded with the seed mixture described in Section 2.05.4 as <br />quickly as possible. <br />4.14 Backfilling and Grading <br />4.14.1 General Requirements <br />The mining operations of Colowyo will not employ the use of contour mining methods. <br />The following sample of calculations show that Colowyo does not have thin or thick overburden as <br />defined in Subsection 4.14.4 or Subsection 4.14.5. These calculations represent the approximate <br />conditions found in the field and show that there is always more than enough overburden to reestablish <br />Rule 4 Performance Standards 4-35 Revision Date: 1/31/18 <br />Revision No.: TR -119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.