My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-20_PERMIT FILE - C1981019A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-03-20_PERMIT FILE - C1981019A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2018 7:38:33 AM
Creation date
4/25/2018 6:42:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
3/20/2018
Doc Name
Volume 1 Rule 4
Section_Exhibit Name
4.02 Throuugh 4.30
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br />Once Haul Road A outslope is stabilized the BMP's will be removed. Utilization of BMP's during <br />construction and until the outslopes of the road are stabilize will minimize any potential impacts to Taylor <br />Creek. It is anticipated that the Haul Road A footprint will not have any short or long term impacts to <br />Taylor Creek. <br />During the widening of Haul Road A, two light use roads will be constructed at the toe of the Haul Road <br />A to provide access to the Taylor Pump Holding Pond and a water rights diversion structure on Taylor <br />Creek. Both structures will have proper BMPs installed and maintained until construction and <br />stabilization of the light use roads is complete. It is not expected that the light use road will have any <br />short or long term impacts to Taylor Creek. <br />Two sediment ponds were constructed within the stream buffer zone on Taylor Creek. The West Pit Pond <br />embankment lies within 100' of Taylor Creek, and the West Taylor Pond was constructed at the base of <br />the West Taylor Fill and makes up part of Taylor Creek. During construction and to date these structures <br />have not created any adverse impacts to Taylor Creek, and both structures are also not anticipated to have <br />any long term impacts to Taylor Creek. <br />Much of the upper reaches of Taylor Creek above the West Taylor Pond will be directly impacted by the <br />South Taylor Pit, and the permeant West Taylor Fill (see Map 23A). The West Taylor Pond will protect <br />the lower reaches of Taylor Creek that will not be disturbed during mining and reclamation. It is <br />expected that during mining the South Taylor Pit will intercept and hold surface water runoff thus <br />providing less discharge through the West Taylor Pond. Once mining is complete the entire South Taylor <br />Pit will be backfilled and the pre -mine profile and function of the upper reaches of Taylor Creek will be <br />restored. <br />One best management practice structure (sediment sump) lies within the stream buffer zone on Taylor <br />Creek. This structure manages storm water runoff from the haul road and provides a benefit to Taylor <br />Creek by capturing stormwater runoff from the haul road. This structure is not anticipated to have any <br />impacts to Taylor Creek, and provides a benefit in protecting stormwater runoff to Taylor Creek. <br />The Taylor Pump Holding Pond was constructed within 100' of Taylor Creek. The Taylor Pump Holding <br />Pond is utilized to manage water movement from Wilson Reservoir to the active operation; therefore, an <br />underground water pipeline that transports water to and the from the Taylor Pump Holding Pond was also <br />constructed at various locations within 100' of Taylor Creek as shown on Map l OC. Neither of these <br />structures has impacted Taylor Creek, and neither structure is expected to have any long term impacts to <br />Taylor Creek. <br />A water diversion structure is constructed in Taylor Creek that allows Colowyo to divert water from <br />Taylor Creek to exercise a water right. This structure would be utilized even if mining was not occurring <br />at Colowyo, as Colowyo is the private surface landowner utilizing a privately held water right structure. <br />A light use road that was a premine "ranch" road follows along Taylor Creek. This road is utilized to <br />access the West Pit, East Taylor, and West Taylor sediment ponds. The road has been improved upon <br />from its premine condition to allow equipment access for dredging activities and continued environmental <br />monitoring. The lower reach of the road where it begins off of the paved haul road up to the East Taylor <br />Pond, snakes in and out of the 100' stream buffer zone off of Taylor Creek. The upper reach from the <br />East Taylor Pond to the West Taylor Pond is almost exclusively within the 100' stream buffer zone due to <br />steep topography. To date this road has not created any adverse impacts to Taylor Creek, and it is not <br />anticipated to have any long term impacts to Taylor Creek. <br />Rule 4 Performance Standards 4-22 Revision Date: 1/31/18 <br />Revision No.: TR -119 <br />