My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-20_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-03-20_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2018 7:27:12 AM
Creation date
4/25/2018 6:38:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
3/20/2018
Section_Exhibit Name
2.05 Operations and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 2 PERMITS <br />are designed to safely pass the runoff from a 10 -year, 24 -hour precipitation event and, where <br />necessary, will be constructed using bank stabilization methods including energy dissipators, <br />sediment traps, and dug outs or a combination of these methods. Drainage culverts will also use <br />energy dissipators at the outlets if necessary so that runoff will not cause additional erosion and <br />subsequently increased total suspended solids (TSS) levels. Detention ponds will be used to detain <br />runoff water from the disturbed areas to allow the TSS to settle out and to attain acceptable <br />concentrations for other parameters consistent with the requirements of the NPDES Permit. Any <br />Small Area Exemptions (SAE'S) employed will be designed to minimize contributions of TSS to the <br />hydrologic balance. <br />Infiltration and percolation of precipitation in the mine area may be enhanced by the reclamation <br />techniques of contour furrowing on hillsides and the continued excellent revegetation success at <br />Colowyo. Infiltration rates for the pre -mined and post -mine condition of the land were presented <br />earlier. Striffler and Rhodes (1981) showed through field measurements, using an intense rainfall <br />simulation, that infiltration capacities of the mulched and revegetated areas were much greater than <br />the pre -mine estimates. Runoff from the revegetated and contour - furrowed areas has been minor to <br />date, as documented by Colowyo Mine personnel. Flows from Streeter Gulch will be moderated with <br />the detention pond. <br />Moderated flows will continue to pass through the historic drainages. Recharge of the limited <br />groundwater systems in the mine will not be inhibited and may be enhanced through the use of the <br />above techniques. <br />Groundwater protection, per se, is not necessary in the permit area as essentially no continuous <br />groundwater system exists. Perched aquifers of limited nature will be impacted only in the mine area <br />property. This water will be evaporated. The quantity of groundwater is minimal as evidenced by the <br />lack of water in test holes and the dry active pit. <br />Protection of water quality will also be maintained at the present variable limits through the use of <br />the reclamation procedures listed above. Groundwater will not be affected as the supplies are <br />minimal. Surface water will not be significantly impacted in the mine area. An ongoing monitoring <br />program is maintained by the Colowyo Coal Company to verify the conclusions in the permit <br />application. Sampling stations are maintained and samples collected in accordance with the water <br />monitoring plan approved by the Division. Refer to the annual reclamation reports for results of the <br />sampling program. <br />Flow volumes in the Goodspring Creek Alluvial Valley Floor may be impacted by the Colowyo <br />Mine through exercise of water rights. However, the impact is expected to be minimal as the water <br />rights used are owned by the Colowyo Coal Company and are not an integral part of any ranching or <br />farming operation. The Colowyo Augmentation Plan will mitigate the effects on any other water <br />rights and will provide for flows downstream of the affected area. Quality of water in Good Spring <br />Creek will not be affected by the exercise of the water rights. <br />As discussed under Hydrologic Balance - Permit Area, changes in flow volumes caused by mining and <br />reclamation operations will be less than the accuracy range of present day flow measuring <br />equipment. <br />In summary, the Colowyo Mine will not significantly affect the hydrologic balance or water quality <br />Rule 2 Permits 2.05 -48 Revision Date: 10/23/12 <br />Revision No.: RN -06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.