Laserfiche WebLink
PEABODY SAGE CREEK MINING, LLC <br />SAGE CREEK MINE - PERMIT C-2009-087 <br />MID-TERM ADEQUACY RESPONSES (04/18) <br />Item 1: Table Updates <br />Please update the Peabody Energy Corporation: NOV report (Exhibit 2.03.5 -EI) to include the WQCD <br />NOT as listed in the updated pages provided with RNI in Section 2.03.5. <br />Please update Tables 2.04.7 T-9 through T-12 to represent any updates to the Monitoring Plan, <br />including a reference to the new nomenclature of the NPDES points. <br />Response: Exhibit 2.03.5-E1 has been reviewed and updated to reflect any recent NOV's, consistent <br />with the applicable regulatory requirements, specifically including the referenced WQCD NOV. Copies <br />of the updated permit documentation accompany these responses for replacement in the PAP. <br />Tables 2.04.7 T-9 through T-12 have been reviewed and updated to include any updates or <br />modifications to monitoring plans, and to reflect the WQCD re -designation of discharge monitoring <br />points. Copies of the updated permit documentation accompany these responses for replacement in the <br />PAP. <br />Item 2: NPDES Permit <br />Exhibit 2.05.3-E3, CDPHE Water Discharge Permit, includes a permit which expired December 31, <br />2012. As of August 2016, pg. 2.03-21 of the Permit references the NPDES permit as "Expires: <br />Reapplication Pending". DRMS understands that this permit is still in the appeals process, but DRMS <br />requests that this be updated with an explanation of the discharge permit status, and that a copy of the <br />draft permit that Sage Creek Mine is currently working under, be added to the DRMS permit for <br />reference and clarity. <br />Response: The referenced Exhibit and related text have been reviewed and updated to explain the <br />CDPS permit renewal process and status. A copy of the final issued permit is provided for reference and <br />context. Copies of the updated permit documentation accompany these responses for replacement in the <br />PAP. <br />Item 3: CDPHE Air Permit <br />Permit Section 2.05.3 (pg. 2.05-63) describes the Air Pollution Control Plan in effect at the Sage Creek <br />Mine as meeting the requirements of Rule 2.05.6(1). DRMS was unable to locate a current copy of the <br />approved air emissions permit fr-oni the Colorado Department of Public Health and Environment — Air <br />Pollution Control Division. Please update this section as needed and provide a current Air Emissions <br />Permit. <br />Response: A Construction Permit (Permit l OROI 175F) was issued by APCD on 09/04/12. PSCM filed <br />Notification of Start-up for AIR'S Points 001 (01/16/13), and 002, 004, and 006 (08/16/12 - in <br />anticipation of Permit issuance) under this Permit. Most site development activities were idled about the <br />time the Permit was issued, and a Notice to Set Emissions to Zero was submitted (10/12/12) for AIR'S <br />