Laserfiche WebLink
APPENDIX 4: DRAINAGE DISCHARGE REPORT FORM <br /> Instructions: This report shall be completed when rainwater from bermed areas is drained into a storm drain <br /> or into an open water course, lake, or pond, and bypasses the in-plant treatment. The bypass valve normally <br /> should he sealed closed and only opened and resealed following drainage under responsible supervision. <br /> Description of I Signs <br /> Bermed Area of If yes, describe Start End <br /> and Current Date oil in corrective Signature <br /> Plant Location water? <br /> actions taken. Time Time <br /> Portable Gencor Asphalt Plant Page 19 <br /> SPCC Plan August 31, 2005 <br />