Laserfiche WebLink
• <br /> Colorado Department of Public Health and Environment <br /> Air Pollution Control Division <br /> A&S Construction Co. <br /> Permit No. 01 P00032 <br /> Issuance 3 <br /> With respect to this Condition, Part D requirements may apply to future modifications if emission <br /> limits are modified to equal or exceed the following threshold levels: <br /> AIRS Equipment Emissions (tons per year) <br /> Point Description Pollutant <br /> Threshold Current Permit Limit <br /> PM 250 5.7 <br /> PM10 250 3.4 <br /> 001 Hot mix asphalt plant <br /> PM25 250 2.8 <br /> CO 250 52.2 <br /> GENERAL TERMS AND CONDITIONS: <br /> 22. This permit and any attachments must be retained and made available for inspection upon <br /> request. The permit may be reissued to a new owner by the Division as provided in Regulation <br /> No. 3, Part B, Section 113 upon a request for transfer of ownership and the submittal of a revised <br /> APEN and the required fee. <br /> 23. If this permit specifically states that final approval has been granted, then the remainder of this <br /> condition is not applicable. Otherwise,the issuance of this construction permit is considered initial <br /> approval and does not provide "final" approval for this activity or operation of this source. Final <br /> approval of the permit must be secured from the APCD in writing in accordance with the <br /> provisions of 25-7-114.5(12)(a) C.R.S. and ADCC Regulation No. 3, Part B, Section III.G. Final <br /> approval cannot be granted until the operation or activity commences and has been verified by <br /> the APCD as conforming in all respects with the conditions of the permit. Once self-certification <br /> of all points has been reviewed and approved by the Division, it will provide written <br /> documentation of such final approval. Details for obtaining final approval to operate are <br /> located in the Requirements to Self-Certify for Final Approval section of this permit. The <br /> operator shall retain the permit final approval letter issued by the Division after completion of self- <br /> certification with the most current construction permit. <br /> 24. This permit is issued in reliance upon the accuracy and completeness of information supplied by <br /> the applicant and is conditioned upon conduct of the activity, or construction, installation and <br /> operation of the source, in accordance with this information and with representations made by the <br /> applicant or applicant's agents. It is valid only for the equipment and operations or activity <br /> specifically identified on the permit. <br /> f <br /> 1 a <br /> By: By: FOR <br /> Renee Lee R K Hancock III, P.E. <br /> Permit Engineer Construction Permits Unit Supervisor <br /> Permit History <br /> Issuance Date Description <br /> Initial Approval June 26, 2001 Issued to A&S Construction Company <br /> AIRS ID: 777/1674/001 Page 8 of 12 <br />