Laserfiche WebLink
The blue arrows show the permit boundary for comparison with the surrounding <br /> topography. <br /> 9. Submit bond estimate <br /> The current bond amount was submitted in 2006. This bond has been recalculated to <br /> reflect the interim reclamation/removal of ore from stockpiles phase of this operation. A <br /> separate bond is included for the 30 foot area outside the original permit boundary where <br /> reclamation is proposed. See bond calculation spreadsheets, Exhibit#5. <br /> EXHIBIT E-Map (Rule 6.3.5) <br /> 10: The maximum final slopes of reclaimed areas will be 3:1 rather than 6:1. The final <br /> Reclamation Map, E-5, has been corrected and is enclosed as Exhibit#4. <br /> 11. The stockpiled tailings material will be used during interim reclamation, over-steep <br /> stockpiles that are left will be graded out, and all resulting slopes on stockpiles will be no <br /> greater than 3:1. The Mine Map and Interim Reclamation Map, (E-3/E-4) has been <br /> corrected and is enclosed as Exhibit#3. <br /> EXHIBIT I-Proof of Filing with the County Clerk(Rule 6.3.9) <br /> Changes and additions to the application on file with the Division, will be reflected in the <br /> public review copy. Enclosed please see that the amended copy has been filed (Exhibit <br /> #6). <br /> EXIBIT S-Permanent Man-Made Structures (Rule 6.3.12) <br /> There are six structures within 200 feet of the Scott Blue II claim and amendment area. <br /> These include (1) buildings on the State Highway property, (2) a dirt road that accesses <br /> the Gold King Mountain Inn, (3) paved road, City of Cripple Creek, (4) dirt road, Dee <br /> Ann McGennis, Cripple Creek Heights, (5) powerlines, Black Hills Energy, (6) dirt road, <br /> John Schaffer, Brooklyn Mine. (Exhibit#7). <br /> See notarized agreements (Exhibit#8). <br /> I appreciate the opportunity to correct the deficiencies in AM-01, M-2007-031. My plan <br /> is to complete all final reclamation in Parcel 2 during the summer and fall of 2018. <br /> Interim reclamation in Parcel 1 will begin in the fall of 2018, but may not be completed <br /> until 2019 when the ponds are again dry. <br /> Sincerely, <br /> Foster Scott <br /> Pres. The Turquoise Connection, Inc <br /> 107 Wild Rose Dr. <br /> Canon City, CO 81212 <br /> 5 <br />