Laserfiche WebLink
30 foot area <br /> A ( B ( c 0 ( E ( F 1_ G H <br /> 1 RECLAMATION BOND CALCULATION SPREADSHEET <br /> 2 Revised 12/4/2010 1 I i <br /> 3 NOTE: USE THIS SPREADSHEET ONLY IF YOUR TOTAL DISTURBANCE IS LESS THAN 20 ACRES AND AN AQUIFER <br /> 4 PROTECTION PERMIT IS NOT REQUIRED. <br /> 5 <br /> 6Jl SER INPUT AND RECLAMATION COST TOTAL <br /> 7 Please fill in the yellow cells relating to the areas to be disturbed during the operation. <br /> 8 Use the units indicated-feet(ft),square feet(sf),inches(in),cubic yards(cu yd),etc. <br /> 9 Identify structure construction type by placing an X in the . ••'ate cell. <br /> 10 Leave boxes that do not apply to your operation blank. <br /> 11 <br /> 122 Roads _ #1 L= a (ft) Width(ft) I <br /> 13 (average lengths and widths) #2 Length(ft) Width(ft) <br /> 14 #3 Length(ft) Width(ft) <br /> 15 <br /> 18 Road cuts #1 Length(ft) Width(ft) Depth of cut(ft) <br /> 17 (ave.length,width and depth #2 Length(ft) Width(ft) Depth of cut(ft) <br /> 18 of cut at hi.hwall #3 L, ., ft Width ft D-•, of cut ft <br /> 19 111111111 <br /> 20 <br /> 21 Cleared areas #1 Length(ft) 30 90 <br /> 22 (average lengths&widths) #2 Length(ftj- <br /> 23 #3 Len.th ft - <br /> za n paoe., - <br /> 25 <br /> 26 Drill pads #1 Length(ft) - Depth of cut(ft) <br /> 27 (average lengths,widths and #2 Length(ft) Width(ft) Depth of cut(ft) <br /> 28 de. of cut #3 L:, .. ft Width(ft) D:•, of cut ft <br /> 29 <br /> 30 <br /> 31 Culverts #1 Length(ft) Diameter(ft) u '� <br /> 32 (average lengths,diameter #2 Len. ft IIIMME Diameter(ft) IIIIMI Ave.der ft <br /> 33 and depth of burial) #3 L, .. ft MEM Diameter(ft) <br /> 34 <br /> 35 Waste dumps/spoil piles #1 Length(ft) Width(ft) Face height(ft) <br /> 38 (average lengths,widths and #2 Length(ft) Width(ft) Face height(ft) <br /> 37 height of top surfaces of dump) #3 Length(ft) Width(ft) Face height(ft) <br /> 38 #4 Length(ft) Width(ft) Face height(ft) <br /> 39 #5 Length(ft) Width(ft) Face height(ft) <br /> 40 #6 Length(ft) Width(ft) Face height(ft) <br /> 41 #7 Le .. ft Width ft Face hei.ht ft <br /> 42 #8 Lena ft - i i T) <br /> 43 #9 L= e h ft -=='- Facehei.ht ft <br /> 44 #10 Len.h ft -MEIMM'- Face hei.ht ft <br /> 45 --- <br /> 46 Shafts #1 Length(ft) Width(ft) Depth(ft) _ <br /> 47 (lengths and widths of shafts I . of water ft MOM <br /> 48 at collar) #2 L= . ft MIMI Width(ft) I I Depth(ft) <br /> 49 De. of wet, ft - <br /> 50 ii #3 Length(ft) - Width(ft) I Depth(ft) <br /> 51 Depth of water(ft)11111=111 <br /> 52 <br /> ater(ft)- <br /> 52 #4 Length(ft) Width(ft) Depth(ft) <br /> 53 Depth of water(ft)- <br /> 54 #5 Length(ft) ili Width(ft) I Depth(ft) <br /> 55 'Depth of water(ft)- <br /> 56 MEM <br /> 57 Dista%e to source of HC fill Miles _ <br /> 58 <br /> 59 Pits I #1 Length(ft) Width(ft) Depth(ft) <br /> 60 (average lengths and widths #2 Length U _ Width(ft) Depth(ft) <br /> 61 at surface) #3 Length(ft) - Widthffi) Depth(ft) <br /> 62 #4 Length(ft) Width(ft) _ Depth(ft) <br /> 63 #5 Length(ft) Width(ft) - Depth(ft) <br /> 64 #6 • Length(ft) Width(ft) Depth(ft) <br /> 65 #7 Length(ft) Width(ft) Depth(ft) <br /> 66 #8 Length(ft) Width(ft) Depth(ft) <br /> 67 #9 Length(ft) Width(ft) Depth(ft) <br /> 68 #10 Length(ft) Width(ft) Depth(ft) <br /> 69 <br /> 70 INghwalls #1 Length(ft) Height(ft) Blasting required? <br /> 71 (average length and height) #2 Length(ft) Height(ft) (Yes or No) <br /> 72 #3 Length(ft) Height(ft) <br /> 73 #4 Length(ft) - Height(ft) <br /> 74 <br /> 75 Trenches #1 Length(ft) 30 Width(ft) 100 Depth(ft) 2 <br /> 76 (average lengths and widths #2 Length(ft) 8 Width(ft) 10 -Depth(ft) 4 <br /> 77 at surface) #3 Length(ft) Width(ft) Depth(ft) <br /> 78 #4 Length(ft) Width(ft)- Depth(ft) <br /> 79 #5 Length(ft) Width(ft) Depth(ft) <br /> 80 #6 Length(ft) Width(ft) Depth(ft) <br /> 81 #7 Length(ft) _ Width(ft) Depth(ft) <br /> 82 #8 Length(ft) Width(ft) Depth(ft) <br /> 83 #9 Length(ft) Width(ft) Depth(ft) <br />