Laserfiche WebLink
EXHIBIT 2.05 -E5 <br /> RECLAMATION DETAILS <br /> TABLE OF CONTENTS <br /> Hubbard Creek Reclamation Documentation(USFS Letter and Drawings E8-3352R/ <br /> 3352RA and E8-3364) <br /> Bear Creek Reclamation Documentation(Drawings C8-1191/1226R) <br /> Portal Seal Details (Drawings A8-1367/1367-1) <br /> Regrading Plan—Somerset Mine(Former Appendix K) <br /> Soil Recovery and Replacement Plan <br /> Mine Reclamation Material Balance, Post Mining Land Use Considerations <br /> Typical Shaft Closure Plan— 11/21/2008—Concrete Cap Design <br /> Correspondence from U.S. Army Corps of Engineers. <br /> Correspondence from Ragged Mt. Fire Protection District, Post Mining Bathhouse Availability. <br /> Elk Creek Mine—Portal Shaft Sealing Plan <br /> Exhibit 2.05-E5-Ml - Reclamation Cut/Fill Isopach, 2 Sheets <br /> Exhibit 2.05—E5-M2—Post Mine Cross Sections—Hubbard Creek Fan site, 1 Sheet. <br /> Correspondence from Hotchkiss Ranches, Inc. <br /> MR-108 April 2018 <br />