Laserfiche WebLink
Oxbow Mining LLC <br />Elk Creek Mine <br />Hole Number: TGA Project ID.: Elk Creek Mine Gas Sample Wells <br />Lease Number: COC -61357 (State or Federal) Surface Owner: USFS <br />Date Commenced: 29 -Apr -13 Date Completed: 3 -May -13 <br />Contractor: Himes Drilling Rig Type: Atlas Copco RD20 <br />NA <br />Mud: Foam Injection: <br />Geologist: <br />Doug Allen Date : 22 -Aug -13 <br />Toolpusher: Matt Himes <br />Driller: <br />Mike Hibbard Truck Driver: <br />Jim Weatherton <br />Helper: Kenny Nobriga <br />Kirk Homedew <br />Richard Moores <br />Jerry Blair <br />Coordinates: N. <br />18503.21 E. <br />37846.87 <br />Resistivity:Caliper: <br />Location: Township, <br />Range & Section: <br />SW 1/4, Sec. 32, T.12 S., R. 90 W. <br />Ground Elevation: <br />8386' Collar Elevation: <br />Interval: to surface <br />Geophysical Log Measured <br />From: ground <br />Elevation <br />Total Depth: <br />2632' Probe Depth: <br />2637' <br />Fluid Level: NA <br />Casing Type: <br />steel T&C <br />Size: <br />7" <br />Casing Type: <br />steel T&C <br />Size: <br />4.5" <br />Depth: <br />0-112' Recovered (Y or N): <br />N <br />Depth: <br />0-2632' Recovered (Y or N): <br />N <br />Bit Information <br />Surface Casing <br />9 7/8" Tricone to 112' <br />Main Hole <br />61/4" PDC from 112-2632' <br />Core: <br />Bottom Hole <br />Directional drilled from 500' into mine @ 18497.72N/ 37891.73E <br />Footage Plugged: 0-2762' Cored: <br />Drilling Medium: Air: Foam Mater: <br />NA <br />Mud: Foam Injection: <br />Depths: 0-112' 112-2632' <br />Lost Circulation Depths: NA <br />Regained ? (Y or N): <br />Water Invasion Depth or Intervals: NA <br />Estimated Inflow Rates: <br />Gas Invasion Depth or Interval: NA <br />Geophysical Logging Contractor: Jetwest Geophysical <br />Logs Run: Gamma: <br />Neutron: <br />Temperature: X-89deg F in mine <br />Density: <br />Resistivity:Caliper: <br />Other (SP, Foc. Elec., Drift, Dep., Sonic): <br />video <br />Hole Cemented (Y or N ), Type: N <br />No. of Bags: 4 cubic yds cement for annulus <br />Interval: to surface <br />Coal Core Sent To: NA <br />Rock Sent To: NA <br />Comments: <br />1114" tubing hung from flange/valve assembly on 4.5" casing <br />with 10' slotted joint in mine horizon for gas sampling. <br />9-23-15 pulled 1.25" tubing, pushed plug to 60', mix 2x80# sacks concrete and put on top of plug. <br />9-28-15- use cement truck to fill up 4.5" casing back to surface 1/4 Yd concrete. <br />Himes Drilling Colorado water well license #1285 <br />