Laserfiche WebLink
April 2018 C-1981-010/Trapper Mine RAR <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 7 of 8 <br /> <br />7CCR where no points were collected. A map (Map1), depicting the locations of these drill sites is <br />provided in this report. Trapper is required to construct a mud pit to contain water generated from the <br />drilling operation and it appears that this was done. A discussion of the observations at each drill site <br />follows: <br /> <br />The division evaluated the reclamation of sites reclaimed as per topsoiled and seeded characteristics as <br />per Rule 4.13. The 13 reclaimed drilling sites are surrounded by well established vegetation, some <br />shrubby and some grassland. <br />o All sites had been graded, topsoiled and seeded with the exception of site 2017 Gravel 3, (photo <br />8). This site should be graded, topsoiled and seeded as soon as soil conditions allow and by May <br />2018 inspection. <br />o No rills or gulleys were noted at any of the drill sites. <br /> <br /> Map 1: Location of the 12 development drilling sites in conjunction with Phase III reclamation (light green polygons). <br /> <br /> <br /> <br /> <br /> <br /> <br />