Laserfiche WebLink
Pond F Y Y runoff from <br />facilities <br />Foidel <br />Pond G Y Y Surface Runoff <br />from laydown <br />Area <br />Foidel <br />Pond E Y Y delta at inlet is forming <br />Area No. 1 Pond <br />(Pit Pond) <br />Y Y mine, sumps, <br />diversion dich <br />Pond D <br />Pond D Y Y Mine water <br />Pond B Y Y Bob pile Foidel <br />Pond C Y N <br />Pond T N N laydown area Foidel v-notch weir, culvert under railway <br />always trickling <br />Water Treatment <br />ponds <br />Y Y (to <br />leach <br />field) <br />facilities water leach <br />field <br /> <br /> <br />Stream buffer zone <br />@ train load-out <br /> Barrels have been placed to protect <br />buffer zone, signs should be placed <br />east of the barrels to show extent <br />of buffer zone more clearly <br /> <br /> <br />Flume at pond B <br /> <br />REVEGETATION – Rule 4.15 <br />Vegetative Cover; Timing: