Laserfiche WebLink
-;- <br /> 12. Ptimarr future (Post-fain land use(check one): <br /> Cropla nd(CR) Pastureland(PL) General Agrictdture(GA) <br /> Raugelauid(RL) Foresny(FR) 'Wildlife Habitat(RZ) <br /> Residential(RS) Recreation(RC) Indtutrial-Conunercial(IC) <br /> Developed Water ResoutrcesO XTR) Solid R'aste Disposal(«'D) <br /> 13. Primary present land use febevek one: <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) WildlifeI-abitat(NIT) <br /> Residentiai(RS) Recreation(RC) _ Industrial�Conumercial(IC) <br /> Developed Water Resotuces(XV ) <br /> 14. Method of Mining: Briefly explain mining method(e.g.tntck%shovel): <br /> Sand and gravel mining pit using a front-end loader, and highway haul trucks. <br /> 15. On Site Processina: _a Crushing•Screening <br /> 13.1 Briefly explain mining method(e.g.tnick shovel): <br /> On-site processing may be by operator or contracted parties. <br /> List any designated chemicals or acid-producing materials to be rued or stored nithin pennit area: <br /> None <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation.provide a brief narrative describing the proposed clnange(s). <br /> The 112 permit conversion will add an additional 157.6 acres to the existing 9.9 acre 110 permit <br /> area. The existing area is about depleted of mineable material. The proposed new mining area <br /> will begin in Phase A, then proceed in sequence to final Phase I <br /> 10 <br />