RPM,Inc. <br /> equals 158.54 acres which includes mining through the original 11 Oc permit access road <br /> (0.94-acre). The 110-mining area equals 8.96 acres. The actual acres added equals 157.6. <br /> (158.54—0.94= 157.6 acres) <br /> 6.4.4 Exhibit D-Mining Plan <br /> 6. The total Approximate Minable Acres provided by the Applicant on Table I in Exhibit D- <br /> Mining Plan indicates the Total Approximate Mineable Acres is 159.88. On Page 1, Item <br /> U.1 —Change in acreage on the Conversion Application Form, the Applicant proposes <br /> adding 157.9 acres to the existing 9.9 permitted acres. Please explain the acreage <br /> discrepancy between Table I and the conversion application form. Please revise the <br /> conversion application as required to resolve the discrepancy. <br /> Response: <br /> We have corrected Table I. We have reduced Phase C mineable acres slightly to ensure we <br /> are within the lease agreement of 167.5 acres. We have revised all documents to reflect the <br /> correct total acres, 167.5. Total of the all Phases equals 158.54 acres which includes <br /> mining through the original 1 IOc permit access road. The 158.54 includes the 0.94-acre <br /> access road. The 110-mining area equals 8.96 acres. The actual acres added are 157.6. <br /> However the total for all Phases is 158.54 which include the acres for the original access <br /> road. (8.96+ .94+ 157.6= 167.5 acres.) <br /> 7. The Total Acres value provided by the Applicant on Table I in Exhibit D-Mining Plan <br /> indicates the Total Acres at 167.5. On Page 1, Item #3-Permitted acreage (new and <br /> existing site) on the Conversion Application Form, the Applicant proposes adding 157.9 <br /> acres to the existing 9.9 permitted acres for <br /> 167.8 total acreage in the conversion permit area. Please explain the total acreage <br /> discrepancy between Table I and the conversion application form. Please revise the <br /> conversion application as required to resolve the discrepancy. <br /> Response: <br /> Table one,Phase C has been corrected down to 16.44 acres. In addition,the Mine Plan <br /> and Reclamation Plan maps and application form have also been revised to reflect the <br /> acreage reduction. These changes,taking into account the access road, should correct <br /> the discrepancy. Acreage totals on the application form and throughout the Conversion <br /> Application now match. <br /> &4.6 Exhibit F-Reclamation Plan Map <br /> 8. The legal description provided by the Applicant on the Exhibit F-Reclamation Plan Map <br /> states the proposed conversion permit area boundary is 167.5 acres. On Page 1, Item #3 - <br /> Permitted acreage (new and existing site)on the Conversion Application Form, the <br /> Applicant proposes adding 157.9 acres to the existing 9.9 permitted acres for 167.8 total <br /> acreage in the conversion permit area. Please explain the total acreage discrepancy <br /> between the map and the conversion application form. Please revise the conversion <br /> application as required to resolve the discrepancy <br /> RPNI,Inc.,22151 E.Euclid PI.,Aurora,CO 80016 Phone:(303)854-7499 Email:hlhumphries2ncomcast.net <br />