My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-04-13_REVISION - M2001056 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001056
>
2018-04-13_REVISION - M2001056 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:02:20 PM
Creation date
4/13/2018 4:01:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001056
IBM Index Class Name
Revision
Doc Date
4/13/2018
Doc Name
Completeness Response
From
RPM, Inc.
To
DRMS
Type & Sequence
CN1
Email Name
PSH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(e) An approximate timetable to describe the mining operation: <br /> This is an ongoing,intermittent mining operation. The expected life of the mining area is <br /> 15 to 21 years,depending on County needs. We estimate the amount of mineable acres <br /> by phase is as follows: <br /> Table 1: Phase,Mineable Acres and Timetable* <br /> Phase Approximate Mineable Approximate <br /> Acres Production Period <br /> -Years <br /> A 22.37 2.3 <br /> B 15.15 2.3 <br /> C 16.44 2.3 <br /> D 16.29 2.3 <br /> E 17.15 2.3 <br /> F 18.37 2.3 <br /> G 17.22 2.3 <br /> H 17.35 2.3 <br /> I 18.20 2.3 <br /> Total 158.54 (Total Acres 167.5) 20.7 <br /> * Extraction will be concluded in the existing 110 permit area prior to beginning in the <br /> 112 conversion expansion area. The existing 110 acres are not included in the Phase <br /> table above. <br /> (i) An estimate of the periods of time which will be required for the various <br /> phases: <br /> Please see the above Table 1. <br /> (ii) A description of the size and location of each area to be worked during each <br /> phase: <br /> Please see the Pre-mine/Mine Plan map and the above Table 1. <br /> (iii) Outline the sequence in which each phase of the operation will be carried <br /> out: <br /> Please see the Pre-mine/Mine Plan map and the above Table 1. <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.