Laserfiche WebLink
Aggregate Industries South Platte Combined SWSP April 13, 2018 <br />Plan IDs 3614, 4773, 3624, 4772, 4616, 3437, 3376, 3650, 3668, and 5475 Page 14 of 20 <br /> <br />monthly with the meter readings included on submitted accounting. As long as dewatering <br />operations remain continual at constant rates the net accretions are assumed to offset any lagged <br />depletions. Under this assumption, the Applicant is not claiming any dewatering credit. Once <br />dewatering operations stop, or are significantly reduced, at specific sites the monthly meter readings <br />will be used to analyze post pumping depletions. The sites undergoing active dewatering during this <br />SWSP period are the Wattenberg Pit, W.W. Farms Pit, and the Tull Pit. <br /> <br />Long Term Depletions and Reclamation <br />In accordance with the letter dated April 30, 2010 (copy attached) from the Colorado Division <br />of Reclamation, Mining, and Safety (“DRMS”), all sand and gravel mining operators must comply with <br />the requirements of the Colorado Reclamation Act and the Mineral Rules and Regulations for the <br />protection of water resources. The April 30, 2010 letter from DRMS requires that you provide <br />information to DRMS to demonstrate you can replace long term injurious stream depletions that <br />result from mining related exposure of ground water. The DRMS letter identifies four approaches to <br />satisfy this requirement, which are identified and described in the attached letter. <br /> In accordance with approach no. 4, you have provided an affidavit dated February 29, 2012, <br />that dedicates the 13.5 shares of the Whitney Ditch Company and 96 shares of the Fulton Irrigating <br />Ditch Company described above as replacement water solely for this combined SWSP for as long as <br />there are depletions at these gravel pit sites or until such time as another replacement source is <br />obtained. This dedication supersedes a previous dedication dated January 25, 2011. A copy of the <br />affidavit is attached to this letter. For the purposes of this SWSP, this affidavit will be accepted for <br />the dedication of the shares; however, if the State Engineer determines that a different affidavit or <br />dedication process is necessary to assure proper dedication of the shares, additional information may <br />be required prior to future SWSP approvals. The current bond posted for the F-Street pit was found <br />to be inadequate during a site inspection by DRMS on February 10, 2012. Per an August 14, 2012 <br />letter from DWR, we will continue to renew the SWSP for the F-Street Pit to allow time for Aggregate <br />to actively work towards settling legal matters pertaining to the long-term replacement source with <br />the land owner. Until this issue is resolved, or shares are dedicated to this plan for the purposes of <br />long term injurious stream depletions, no diversion of ground water beyond that approved by this <br />SWSP (evaporation) will be permitted at the site. <br /> A summary of the final reclamation and the compliance approach to the DRMS letter including <br />the current posted bond amount is shown in Table E. <br />Table E – Final Reclamation Summary <br />Site Name Proposed Final <br />Reclamation Bond <br />Amount DRMS <br />Approach No. Comments <br />Jeronimus Pit Backfilled $1,510,800 1, 4 Backfilling of all post-81 areas in progress. <br />Water rights dedicated via February 29, 2012 <br />affidavit. <br />Hazeltine Pit Lined Reservoir $670,602 3 Bonded for lining. The site has been lined with a <br />slurry wall (WDID 0203381). <br />Brighton Pit Lined <br />Reservoir/Lakes $150,000 1, 3 <br />Bonded for lining. The south and central <br />reservoirs are lined with a slurry wall (WDID <br />0203385) and have obtained SEO liner approval. <br />A bond reduction was approved by DRMS. <br />Tucson South Pit Lined Reservoir $11,000 3 Mining has not yet begun at this site. An <br />increase of bonding is required prior to <br />commencement of mining operations. <br />Wattenberg Pit Lined Reservoir $520,000 3 Bonded for lining. (Pit lined in 2013; however, <br />liner has not yet been tested or approved.)