Laserfiche WebLink
Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No. M-88-112 <br /> March 2018 Monthly Report <br /> Page 2 <br /> Table 1-March 2018 Ground Water Monitoring Well and Lysimeter Depth to Water <br /> Measurements <br /> Monitoring Site Date Depth to Water(feet) <br /> M-4R 3/29/18 0 <br /> M-6 3/29/18 Dry <br /> M-7 3/29/18 Dry <br /> M-8 3/29/18 Dry <br /> M-9 3/29/18 141.43 <br /> M-10 3/29/18 25.50 <br /> M-11 R 3/29/18 39.91 <br /> M-12 3/29/18 174.81 <br /> M-13R 3/29/18 125.68 <br /> M-14 3/29/18 131.14 <br /> M-15 3/29/18 92.12 <br /> M-16 3/29/18 23.45 <br /> M-19 3/29/18 23.28 <br /> M-21 3/29/18 16.90 <br /> M-22 3/29/18 15.82 <br /> M-26 3/29/18 14.96 <br /> M-32 3/29/18 43.26 <br /> M-33 3/29/18 56.01 <br /> M-34 3/29/18 23.69 <br /> BF-4 3/29/18 25.90 <br /> BF-6 3/29/18 30.88 <br /> LS-1R 3/28/18 Dry <br /> LS-2R 3/28/18 Dry <br /> LS-3 3/28/18 Dry <br /> LD-1R 3/28/18 Dry <br /> LD-2R 3/28/18 Dry <br /> LD-3 3/28/18 Dry <br /> Table 2—March 2018 Tailing Disposal Area Piezometer Depth to Water <br /> Piezometer Date Depth to Water Total Depth(ft) Volume of <br /> (feet) Water(ft) <br /> P6 3/29/18 Dry 72.46 0.00 <br /> P7 3/29/18 92.28 92.50 0.22 <br /> P8 3/29/18 96.53 97.51 0.98 <br /> P9 3/29/18 71.96 72.30 0.34 <br />