My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-07-03_GENERAL DOCUMENTS - M1997007
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1997007
>
2006-07-03_GENERAL DOCUMENTS - M1997007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2018 11:38:18 AM
Creation date
4/13/2018 10:40:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997007
IBM Index Class Name
General Documents
Doc Date
7/3/2006
Doc Name Note
Cost Summary Form
Doc Name
Cost Summar Form
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRO. M IDENTIFICATION <br />Task #: <br />003 <br />Date: <br />07/031M <br />User , <br />CMR <br />iR tti n re <br />state : C00oradb <br />County :Erfbert <br />Site : t3Jjou Clay Pit <br />Agency or organization name :DMG <br />Permit or other job action : Bond-mmkdef bn <br />Task description : backfill hmdcut wail <br />IIDIJRLY EQUIPMENT COST <br />Permitljob# : AI -1997-007 <br />Abbreviation :aorta <br />Filename :J111007-003 <br />Basic machine: Cat 08R Series Y - SSU Horsepower: 310 <br />Blade type, Setw-ifn(versel <br />Attachment no. i : RQPS Cob 5hifi basis : 1 per day <br />Attachment no. 2:X4 <br />Data source ; (CRG) <br />Average site attitude: 4000 feet <br />Material weight : 2,500 I1 <br />Weight description: <br />Fleet size : i Dozer(s) <br />Unit cost : $0.331 /LCY <br />Material weight: 0.92 <br />Blade type: 1.00 <br />Not correction: 0.34 <br />Adjusted unit production : 470.18 LCYfhr <br />Adjusted fleet production : 470.19 LCY/hr <br />Total job time : <br />Total job cost: <br />50.19 Hours <br />$7,802 <br />. Utilization % <br />Cost Breakdown : <br />Ownership cost/trour : <br />$47.81 <br />NA <br />Operating cosUhour : <br />$75.28 <br />100 <br />Ripper op. costlhour : <br />$0.00 <br />NA <br />Operator oostftwur : <br />$3253 <br />NA <br />Total unit cosfRsour : <br />$156.43 <br />Total fleet cost(hour : <br />$155.43 <br />' +¢ME. <br />�IIl�►T�RIAI�QUANTtTII:B <br />Initial <br />swell <br />Loose <br />volume: 23,600 LCY <br />factor : <br />NA <br />volume: <br />23:800 <br />LCY <br />Soume of estimated volume :OMG es&nate <br />Source of estimated swell factor :NA <br />UQURLY PRODUCM6" <br />Job <br />ConQrdon <br />Correction Factors <br />Source <br />Operator skill: <br />0.75 <br />(avg.) <br />Average push distance: <br />_5_0_ _ feet <br />Material consistency : <br />1.10 <br />(Cat N8) <br />Unadjusted hourly production, <br />1,400.0 LCY/hr <br />Dozing method : <br />1.00 <br />(gen.) <br />Vislbllity : <br />1.00 <br />(avg.) <br />Material consistency description : <br />Job efficiency: <br />0.83 <br />(1shifNday) <br />Parlfy can3cfidWed stoa" <br />spoil pile: <br />0.80 <br />(lhd-rf) <br />Push gradient : <br />0.67 <br />(Cat HB) <br />Average push gradient: <br />1a00 x (pos) <br />Attitude: <br />1.00 <br />(Cat HB) <br />Average site attitude: 4000 feet <br />Material weight : 2,500 I1 <br />Weight description: <br />Fleet size : i Dozer(s) <br />Unit cost : $0.331 /LCY <br />Material weight: 0.92 <br />Blade type: 1.00 <br />Not correction: 0.34 <br />Adjusted unit production : 470.18 LCYfhr <br />Adjusted fleet production : 470.19 LCY/hr <br />Total job time : <br />Total job cost: <br />50.19 Hours <br />$7,802 <br />
The URL can be used to link to this page
Your browser does not support the video tag.