Laserfiche WebLink
Hazeltine Mine - Dewatering System Preliminary Cost Estimate <br />Force Main System <br />Item <br />Quantity Unit <br />Unit Price <br />Extension <br />Mobilization <br />1 LS <br />$ <br />5,000.00 <br />$ <br />5,000.00 <br />Dewatering <br />1 L5 <br />$ <br />151000.00 <br />$ <br />15,000.00 <br />Clearing and Grubbing <br />1 AC <br />$ <br />2,000.00 <br />$ <br />2,000.00 <br />Channel Excavation <br />1 LS <br />$ <br />10,000.00 <br />$ <br />10,000.00 <br />ridrain (6'x12") <br />1 LS <br />$ <br />11500.00 <br />$ <br />11500.00 <br />12' ManholeNault <br />1 EA <br />$ <br />8,000.00 <br />$ <br />8,000.00 <br />12" HDPE <br />10 LF <br />$ <br />60.00 <br />$ <br />600.00 <br />10" C900 <br />700 LF <br />$ <br />60.00 <br />$ <br />42,000.00 <br />lift Station (1000 gpm) <br />1 LS <br />$ <br />25,000.00 <br />$ <br />25,000.00 <br />Electric Service <br />1 LS <br />$ <br />51000.00 <br />$ <br />5,000.00 <br />Site Reclamation <br />1 AC <br />$ <br />2,000.00 <br />$ <br />2,000.00 <br />Subtotal <br />Contigency (20%) <br />TOTAL <br />$116,100.00 <br />$ 23,220.00 <br />$139,320.00 <br />