Laserfiche WebLink
RULE 4 PERFORMANCE STANDARDS <br />4.07.4 Abandonment in Designated Groundwater Basins <br />This subsection is not applicable to the Colowyo mining plan. <br />Exploration taking place inside and outside of the permit area will be handled through the Notice of Intent <br />(NOI) procedures. See the appropriate NOI for details for each program. <br />With the approval of Technical revision 50, all exploration holes located within the permit boundary are <br />transferred to NOI X-95-109-5 and are managed under Coal Exploration procedures. <br />Wells drilled as an integral part of water monitoring plans identified in the PAP (Permit C-81-019) and <br />water supply wells (for identified in the PAP (Permit C-81-019) and water supply wells (for mining <br />purposes) are managed under this Permit C-81-019. <br />4.08 Use of Explosives <br />4.08.1 General Requirements <br />Colowyo will comply with all applicable State and Federal laws in the use of explosives. <br />Colowyo will conduct all blasts that use more than five pounds of explosives or blasting agent according <br />to the schedule required by Section 4.08.3. <br />All surface blasting operations at the Colowyo operation will be conducted by experienced, certified, <br />trained and competent persons who understand the hazards involved. Persons responsible for blasting <br />operations at a blasting site shall be familiar with the blasting plan and any site-specific performance <br />standards. The blaster and at least one other person must be present at the firing of a blast. Each person <br />responsible for blasting operations will possess a valid certification in accordance with the appropriate <br />federal and state law. <br />Colowyo will not conduct blasting within 1000 feet of any building used as dwelling, school, church, <br />hospital, or nursing facility; and 500 feet of facilities, including but not limited to petroleum or gas <br />storage facilities, fluid transmission pipelines, gas or oil collection lines or water and sewage lines. <br />Distances to various structures of possible concern surrounding the mining area are shown on the Blasting <br />Analysis Map (Map 26). <br />By employing the design criteria to minimize air blast and ground vibration Colowyo will insure that <br />flyrock, including blasting material traveling along the ground, will not be cast from the blasting vicinity, <br />more than half the distance to a nearby dwelling or other occupied structure and in no case beyond the <br />line of property owned or leased by the Company or beyond the area of regulated access required under <br />Subsection 4.08.4(5). The minimization of flyrock is also important and routinely monitored in order to <br />reduce damage to mining equipment. <br />4.08.2 Pre -Blasting Survey <br />Upon request to the Division by a resident or owner of a dwelling or structure located within one-half <br />mile of any part of the permit area, Colowyo will promptly conduct a pre -blasting survey. A copy of <br />correspondence advising our neighbors of this. opportunity is provided in Exhibit 14 - Seismograph <br />Measurements, Item 2. A report of the survey will be submitted to the Division and to the person <br />requesting the survey. The pre -blasting survey will assess the condition of the structure or dwelling and <br />Rule 4 Performance Standards 4-27 Revision Date: 8/28/17 <br />Revision No.: TR -115 <br />