My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-04-13_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-04-13_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 6:49:51 AM
Creation date
4/13/2018 9:45:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
4/13/2018
Doc Name
Volume 1 Rule 4
Section_Exhibit Name
4.02 Throuugh 4.30
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br />4.06 Topsoil <br />4.06.1 General Requirements <br />Before the disturbance of any area, topsoil is removed and segregated from other material. Upon removal, <br />this material is either immediately redistributed on regraded areas or stockpiled in locations shown on the <br />Topsoil Handling Maps 28 and 28A. <br />4.06.2 Removal <br />All topsoil, as classified in section 2.04.9, is removed from areas to be affected by the surface coal mining <br />operations. The graphical representation of the topsoil removal is shown on the Topsoil Handling Map <br />(Map 28 and 28A). This map has been greatly simplified from that of the original application to reflect <br />actual on -the -ground operations. The techniques for removal of woody plant materials that otherwise <br />would interfere with the usefulness of the topsoil is discussed in Section 2.05.3 <br />The average thicknesses for each soils series: to be removed can be found in the legend of the Soils - <br />South Map (Map 6). Removal techniques for topsoil is described in Section 2.05.3. <br />A variance from topsoil removal was requested and approved by the Colorado Division of Reclamation, <br />Mining and Safety for the following areas; construction of small structures such as power poles, signs or <br />fence lines, areas of light traffic that do not destroy existing vegetation or cause erosion and areas where <br />removal would result in needless damage to soil characteristics such as sediment control ditches and small <br />water diversions. In most cases, especially on steep slopes, removal of topsoil prior to ditch construction <br />needlessly damages large areas of topsoil, along with the adjacent natural vegetation. Implementation of <br />the technique of cutting the ditches directly into the hillside without topsoil removal will limit needless <br />topsoil disturbance, reduce unnecessary destruction of adjacent vegetation and will facilitate reclamation <br />of the ditches at a future date. <br />It should also be clarified that consistent with Map 6, Soils — South and Exhibit 9, Volume 19, there will <br />be small areas of rock outcrop, rocky steep slopes, etc. where the topsoil depth is 0 inches. Where this <br />occurs there will not be an attempt to recover topsoil or otherwise disturb the area before disturbance by <br />mining. <br />Colowyo does not plan to use overburden material for topsoil substitutes or as a supplement to topsoil. <br />Colowyo will remove topsoil before any mining operations commence and always maintain a buffer zone <br />between the area stripped of topsoil and the overburden drilling and blasting operations.. As depicted on <br />the Topsoil Handling Map (Map 28 & 28C), the topsoil handling program will result in an orderly <br />sequence for the continuous removal, storage or reapplication of topsoil. The redistribution of topsoil will <br />be done at a time when the physical and chemical properties of the topsoil can be protected from <br />alteration while minimizing the potential for erosion. <br />Topsoil and vegetation matter is typically windrowed, sloped and seeded during initial sediment pond <br />construction and saved for reapplication when the pond is reclaimed at at future date. <br />The pond embankments are constructed utilizing in-place materials directly below the upper topsoil zone. <br />This colluvial material is "topsoil' in nature and will be utilized at a future date for pond reclamation. <br />Since the nature of the embankment material functions readily as a topsoil material, it is not <br />anticpatedthat additional topsoil will be required for final reclamation of the site. However, if necessary, <br />Colowyo will apply an appropriate amount of topsoil to pond embankments that do not readily revegetate <br />post construction. <br />Rule 4 Performance Standards 4-24 Revision Date: 8/28/17 <br />Revision No.: TR -115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.