My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-04-13_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-04-13_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2018 6:50:33 AM
Creation date
4/13/2018 9:43:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
4/13/2018
Section_Exhibit Name
Table of Contents
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br />2.06.1 Scope...........................................................................................................................................2.06-1 <br />2.06.2 Experimental Practices Mining...................................................................................................2.06-1 <br />2.06.3 Mountaintop Removal Mining.....................................................................................................2.06-5 <br />2.06.4 Steep Slope Mining......................................................................................................................2.06-5 <br />2.06.5 Permits Incorporating Variances from Approximate Original Contour Restoration Requirements for <br />SteepSlope Mining.......................................................................................................................................2.06-5 <br />2.06.6 Prime Farmlands........................................................................................................................2.06-5 <br />2.06.7 Variances for Delay in Contempraneous Reclamation Requirements in Combined Surface and <br />Underground Mining Operations.................................................................................................................2.06-6 <br />2.06.8 Surface Coal Mining and Reclamation Operations on Areas or Adjacent to Areas Including Alluvial <br />ValleyFloors................................................................................................................................................2.06-6 <br />2.06.9 Augering and Highwall Mining...................................................................................................2.06-8 <br />2.06.10 Coal Processing Plans and Support Facilities Not Located Within the Permit Area...............2.06-10 <br />2.06.11 In -Situ Processing Activity........................................................................................................2.06-10 <br />RULE 2 MISCELLANEOUS REQUIREMENTS..............................................................................................................2-1 <br />2.07 PUBLIC PARTICIPATION AND APPROVAL OF PERMIT APPLICATIONS...............................................................2-1 <br />2.08 PERMIT REVIEWS, REVISIONS AND RENEWALS, AND TRANSFER, SALE AND ASSIGNMENT.............................2-1 <br />2.10 MAPS AND PLANS — GENERAL REQUIREMENTS..............................................................................................2-1 <br />RULE 3 PERFORMANCE BOND REQUIREMENTS.......................................................................................................3-1 <br />RULE 4 PERFORMANCE STANDARDS.......................................................................................................................4-1 <br />4.01 General Provisions....................................................................................................................................4-1 <br />4.01.1 Scope and Objectives..............................................................................................................................4-1 <br />4.02 SIGNS AND MARKERS................................................................................................................................4-1 <br />4.02.1 Specifications...................................................................................................................................4-1 <br />4.02.2 Mine and Permit Identification Signs...............................................................................................4-1 <br />4.02.3 Perimeter Markers...........................................................................................................................4-1 <br />4.02.4 Duration of Maintenance.................................................................................................................4-1 <br />4.02.5 Stream Buffer Zone Markers............................................................................................................4-2 <br />4.02.6 Blasting Signs...................................................................................................................................4-2 <br />4.02.7 Topsoil Markers...............................................................................................................................4-2 <br />4.03 ROADS.......................................................................................................................................................4-2 <br />4.03.1 Haul Roads.......................................................................................................................................4-2 <br />4.03.2 Access Roads....................................................................................................................................4-5 <br />4.03.3 Light -Use Roads...............................................................................................................................4-5 <br />4.04 SUPPORT FACILITIES..................................................................................................................................4-6 <br />4.05 HYDROLOGIC BALANCE............................................................................................................................4-6 <br />4.05.1 General Requirements......................................................................................................................4-6 <br />4.05.2 Water Quality Standards and Effluent Limitations..........................................................................4-7 <br />4.05.3 Diversions and Conveyance of Overland Flow and Shallow Groundwater Flow and Ephemeral <br />Streams Draining a Watershed Less than One Square Mile.............................................................................4-8 <br />4.05.4 Stream Channel Diversions (Relocation of Streams).......................................................................4-8 <br />4.05.5 Sediment Control Measures.............................................................................................................4-9 <br />4.05.6 Sedimentation Ponds........................................................................................................................4-9 <br />4.05.7 Discharge Structures......................................................................................................................4-10 <br />4.05.8 Acid-forming and Toxic forming Spoil...........................................................................................4-11 <br />4.05.9 Permanent and Temporary Impoundments....................................................................................4-11 <br />4.05.10 Underground Mine Entry and Access Discharges......................................................................... 4-12 <br />4.05.11 Ground Water Protection...............................................................................................................4-12 <br />4.05.12 Protection of Groundwater Recharge Capacity.............................................................................4-12 <br />4.05.13 Surface and Groundwater Monitoring...........................................................................................4-15 <br />4.05.14 Transfer of Wells............................................................................................................................4-20 <br />4.05.15 Water Rights and Replacement......................................................................................................4-20 <br />4.05.16 Discharge of Water into an Underground Mine............................................................................4-20 <br />4.05. 17 Post -mining and Rehabilitation of Sedimentation Ponds, Diversions, Impoundments, and Treatment <br />Facilities.......................................................................................................................................................... 4-20 <br />4.05.18 Stream Buffer Zones ........................ ............................................................................................... 4-21 <br />Table of Contents ii Date Revised: 4/9/18 <br />Revision No: MR -184 <br />
The URL can be used to link to this page
Your browser does not support the video tag.