Laserfiche WebLink
  <br />Mr. Paul Bruss, P.E.  <br />April 12, 2018  <br />Page 4 of 6  <br />  <br />CONDITIONS OF APPROVAL  <br />  <br />This SWSP is hereby approved pursuant to Section 37-90-137(11),C.R.S.,subject to the              <br />following conditions:  <br />  <br />1.This current plan shall be valid February 1,2018 through January 31,2020,unless               <br />otherwise revoked or superseded by decree.If this plan will not be made absolute by                <br />a water court action by the plan’s expiration date,a renewal request must be               <br />submitted to this office and the Division 2 office (please copy Kathy Trask at               <br />Kathy.Trask@state.co.us )with the statutory fee (currently $257)no later than           <br />November 1, 2019.  <br />  <br />2.Well permit nos.75997-F and 80662-F were obtained for the current use and exposed               <br />pond surface area of the gravel pit in accordance with Section 37-90-137(2)and (11),               <br />C.R.S.  <br />  <br />3.The total surface area of exposed ground water and total consumption at the site may                <br />not exceed the amounts given in the attached tables.  <br />  <br />4.The total combined amount of exposed ground water and dewatered area at the              <br />Pueblo East pit may not exceed 37.0 acres.Documentation of pond size may be               <br />required by the Division Engineer in the form of an aerial photo evaluation or survey                <br />by a Professional Land Surveyor during the plan year or in years covered by subsequent                <br />renewals of this plan.  <br />  <br />5.Release of the PBWW waters must be under the Division Engineer’s direction and              <br />approval.  <br />  <br />6.All diversions for dust suppression must be metered in compliance with the “Amended              <br />Rules Governing the Measurement of Tributary Ground Water Diversions Located in the             <br />Arkansas River Basin.”  <br />  <br />7.Accounting of water in this plan,including excavated area,area of actual groundwater              <br />exposure,pumping for dust control,mined product,lagged stream depletions,and            <br />replacement water deliveries must be provided to the Water Commissioner and            <br />Division Engineer on forms and at times acceptable to them.Said accounting must be               <br />emailed to the Division Engineer ( Div2Ground.Water@state.co.us )and the Water          <br />Commissioners ( Steve.Stratman@State.co.us and Doug.Hollister@state.co.us )by the       <br />10th of the month following the month being reported.The name,mailing address,              <br />and phone number of the contact person who is responsible for operation and              <br />accounting of this plan must be provided on the accounting forms.  <br />  <br />8.The approval of this SWSP does not relieve the Applicant and/or landowner of the               <br />requirement to obtain a Water Court decree approving a permanent plan for             <br />augmentation or mitigation to ensure the permanent replacement of all depletions,            <br />including long-term evaporation losses and lagged depletions after gravel mining           <br />operations have ceased.If reclamation of the mine site will produce a permanent