Laserfiche WebLink
Page 3 of 3 <br />Marsh Funnel viscosity of abuxionnient fluid: see. <br />Type of surface plugging used: <br />Depth at which plug set: <br />Method: j - - <br />® 2d- Other method used with approval of the Division <br />method and materials used on a separate attached sheet. <br />B. CONVERSION TO A WATER WELL <br />feet below ground surface, <br />Mining and Safety; describe in detail <br />State Engineer's Permit No.: (attach copy of permit) <br />County Where Well is Located: <br />Water Well Use, <br />V. METHOD OF RECLAIMING DRILL SITE SURFACE DISTURBANCE: <br />The Operator who conducted the orosaectine drill omration states that the information set forth <br />hereupon is true to the best of their knowledge. <br />Harald Hoeabera k <br />(Dame of <br />(Signature ofQperator's <br />Consulting Geologist <br />(Title) <br />3/23/2018 <br />(Date) <br />