Technical Memorandum <br />Liner Integrity Engineering Support <br />VLF2 Geomembrane Recertification <br />NewFields Job No. 475.0106.023 <br />April 10, 2018 <br />Remove all the material to within 2 feet of the geomembrane surface. The initial area of ore <br />removal is approximately 142' wide and 438' long, and is depicted by the black rectangle. <br />During the removal of the ore, the contractor and NewFields' QA/QC personnel will complete <br />inspections to determine the condition of the existing drain cover fill (DCF), solution collection <br />piping, and geomembrane. if damaged liner or piping is observed during the excavation, the <br />area will be further investigated to determine the extent of the damage. <br />f After the material has been removed, several test pits will be carefully dug by small <br />excavation equipment and hand labor to expose the liner. The test pits should be <br />approximately 2' in diameter. NewFields QA/QC personnel will document the condition of <br />the geomembrane. The holes should be left open until the pot holing activities are <br />completed. <br />o As shown on Figure 2, the test pits should initially space 20'. <br />o As the test pitting activities moves down the slope, the spacing of the test pits <br />should be decreased 10', within the area of primary concern, which is depicted by <br />the green hatch. <br />Additional test pitting will also be completed in any damaged areas to define the extent of <br />the damage. <br />The location and spacing of the test pits shown on Figure 2 maybe altered based on field <br />conditions. <br />Once the test pitting is completed, NewFields Certifying Engineer and CC&V's personnel will <br />examine the area of the slide verifying the condition of the geomembrane. If required, <br />additional test pits will be dug to examine the geomembrane. <br />If no defects are located, NewFields will document the backfilling of drain cover material over the <br />exposed geomembrane liner. <br />If defects are located, NewFields will document the repair of the holes and the backfilling of the <br />drain cover material over the exposed geomembrane liner. <br />In either case and upon completion of the work, a certified report will be developed summarizing <br />all the work completed. <br />P:\Projects\0106.023 CC&V Une Integrity Engineering SupportV REPORTS\VLF2 Geamembrane Recertification, Fina' day <br />Page 2 <br />