My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-04-09_PERMIT FILE - M1985029
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1985029
>
2018-04-09_PERMIT FILE - M1985029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:22 PM
Creation date
4/9/2018 4:02:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985029
IBM Index Class Name
PERMIT FILE
Doc Date
4/9/2018
Doc Name
Adequacy Review - Preliminary
From
Greg Lewicki & Associates
To
DRMS
Type & Sequence
AM6
Email Name
MAC
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Topsoil and Overburden Handling <br /> The total current, as of October 2017, disturbed area for the gold mining operation is 114.5 acres <br /> with a total mine life disturbance area of 189.2 acres. Of this amount, 90.3 acres were disturbed <br /> pre-1977 and no topsoil was salvaged. Approximately 65.5 acres of new disturbance, as of <br /> October 2017,will occur if all planned mine cuts are disturbed. The table below shows the <br /> combination of pre-law and post-law disturbance. <br /> 4_1 Disturbed Permit Areas (October 2017) <br /> Area Acreage <br /> Active Mining Areas 4.0 <br /> Berm along Highway 9 2.8 <br /> Topsoil Stockpiles 2.8 <br /> Site Roads 2.0 <br /> Pre-law Area (includes italicized areas above) 90.3 <br /> Post-law areas outside of active cuts 15.8 <br /> Willit's Ponds and West of Gumaer areas 4.2 <br /> Total Disturbed Area 114.5 <br /> It should be noted that this disturbed area is the total for the mine life and is represented by a light <br /> blue cyan boundary on Map C-2. Furthermore,that the affected area is the pen-nit area and is <br /> represented by the permit boundary shown in purple on Map C-2. <br /> As mining and reclamation will occur concurrently, a total of six areas will be disturbed at any <br /> given time. Two areas will be actively mined, two areas in advance of the active mining area will <br /> be stripped of topsoil and overburden in preparation for mining, and two areas behind the active <br /> mining areas will in reclamation. <br /> Therefore, the total area of active mining, as of October 2017, at any one time will not exceed 7 <br /> acres. Exact acreage of mining exclusive disturbance is dependent on the rate of mining and <br /> concurrent reclamation. Currently active mining faces combined with those areas still to be <br /> mined totals 67.7 acres. Therefore, the maximum site disturbance as of October 2017 is 114.5 <br /> Alma Placer Mine <br /> December 2017 D-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.