My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-04-09_PERMIT FILE - M1985029
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1985029
>
2018-04-09_PERMIT FILE - M1985029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:22 PM
Creation date
4/9/2018 4:02:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985029
IBM Index Class Name
PERMIT FILE
Doc Date
4/9/2018
Doc Name
Adequacy Review - Preliminary
From
Greg Lewicki & Associates
To
DRMS
Type & Sequence
AM6
Email Name
MAC
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
42. The financial warranty calculation includes a cost for soil amendments at$250.00 per acre. <br /> Please clarify how this unit cost was arrived at. If the unit cost is tied to specific <br /> amendments, then specify the amendments to be applied as well as the application rate. <br /> This is the same cost as used for fertilizer in the approved AM-05. <br /> 43. Please clarify if the Dozer task includes backfilling sediment ponds I—4. If the Dozer task <br /> does not include the cost to backfill sediment ponds I—4, then the financial warranty <br /> calculation must be revised to include this task. <br /> The dozer task includes the backfilling of those ponds. <br /> 44. Please clarify if the berms on site have been included in the total volume of material to be <br /> backfilled. If the reclamation of the berms has not been included in the total volume of <br /> material to be backfilled, then the financial warranty calculation shall be revised <br /> accordingly. <br /> Berms on site are included in the total volume of material to be backfilled. See revised page <br /> L-2. <br /> 45. Specify the total number of acres of currently affected land which do not have vegetation <br /> established. The Financial Warranty must include a cost to establish vegetation on these <br /> areas, even if the Operator has already attempted to revegetate the areas. <br /> 41.3 acres of currently affected land currently exists without established vegetation. <br /> Rangeland vegetation efforts are and will be accomplished over 41.3 acres. See revised page <br /> L-2. <br /> 46. Specify the total number of acres of currently affected land which still require topsoil or <br /> topsoil substitute replacement. <br /> 41.3 acres will require topsoiling or topsoil substitute. See revised page L-2. <br /> 47. Specify the total volume of material which must currently be graded to reclaim the site, <br /> including any existing sediment or groundwater ponds which must be eliminated prior to <br /> final release. <br /> Dozer work includes the movement and leveling of 166,100 CY of backfill material. See <br /> revised page L-2. <br /> 48. The Division will calculate the required financial warranty once all adequacy concerns have <br /> been addressed. <br /> See revised page L-2. <br /> 6.4.13 Exhibit M—Other Permits and Licenses <br /> 49. Please revise the list of permits, licenses and approvals required for the operation to include <br /> the permits listed in the Division of Water Resources comment letter dated January 31, <br /> 2018. <br />
The URL can be used to link to this page
Your browser does not support the video tag.