Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 005 Page 32 of 32 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: GRAND JUNCTION <br />Total one-way travel distance: <br />40.00 miles <br />Average Travel Speed: <br />40.00 mph <br />Total Non-Roadable Mob/Demob Cost * <br />$5,140.02 <br />`* two round trips with haul rig: <br />NA <br />Total Roadable Mob/Demob Cost ** <br />$455.10 <br />** one round trip, no haul rig: <br />2.00 <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non-Roadable <br />Equipment <br />Roadable <br />Equipment <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />0.50 <br />NA <br />0.50 <br />NA <br />3.00 <br />2.00 <br />Total job time: 6.00 Hours <br />Total job cost: $5,595 <br />CIRCES Cost Estimating Software <br />