My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-04-05_REVISION - C1981020
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981020
>
2018-04-05_REVISION - C1981020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 12:07:44 PM
Creation date
4/9/2018 9:50:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
Revision
Doc Date
4/5/2018
Doc Name Note
Proposed Decision Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
CAM Mining, LLC
Type & Sequence
RN7
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 32 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />422.28 LCY/Hour Adjusted for job efficiency: <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />Adjusted hourly truck team production: 55.88 <br />Adjusted single truck/loader team production: 55.88 <br />Adjusted multiple truck/loader team production: 55.88 <br />nun <br />1 <br />8730.00 <br />10.00 <br />3.00 <br />13.00 <br />834 <br />10.476 <br />Haul Time: <br />Return Route: <br />10.476 <br />minutes <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />422.28 LCY/Hour Adjusted for job efficiency: <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />Adjusted hourly truck team production: 55.88 <br />Adjusted single truck/loader team production: 55.88 <br />Adjusted multiple truck/loader team production: 55.88 <br />min <br />1 <br />8730.00 <br />-10.00 <br />3.00 <br />-7.00 <br />2938 <br />3.063 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: <br />Unit cost: $4.161 /LCY Total job cost: <br />minutes <br />minutes <br />350.49 LCY/Hour <br />27.94 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />0.16 Hours <br />$37 <br />CIRCES Cost Estimating Software <br />Return Time: 3.063 <br />Total Truck Cycle Time: 15.581 <br />Loading Tool unit <br />Production <br />422.28 LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />33.66 LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: <br />13 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 55.88 <br />Adjusted single truck/loader team production: 55.88 <br />Adjusted multiple truck/loader team production: 55.88 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: <br />Unit cost: $4.161 /LCY Total job cost: <br />minutes <br />minutes <br />350.49 LCY/Hour <br />27.94 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />0.16 Hours <br />$37 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.