Laserfiche WebLink
Page 3 of 32 <br />TRUCK/LOADER TEAM WORK <br />Task description: Excavate Topsoil and Haul to Mine <br />Site: Munger Canyon Mine Permit Action: RN7 Permit/Job#: C1981020 <br />PROJECT IDENTIFICATION <br />Task #: 005 State: Colorado Abbreviation: None <br />Date: 3/26/2018 County: Garfield Filename: CO20-005 <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST Shift basis: 1 ner day <br />Truck Loader Team -Truck: Generic 8-10 cy, 6x4 <br />-Loader: Cat 336D L 10'-6" Stick <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Cost Breakdown: Truck/Loader Team Sunnort Eauinment Maintenance Eauinment <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: 100 <br />55 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: $27.37 <br />$46.82 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: $32.23 <br />$28.68 <br />NA <br />NA <br />NA <br />NA <br />%Utilization -riper: NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: $0.00 <br />$37.79 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: $59.60 <br />$113.28 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: 2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: Work: $232.48 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $232.48 <br />MATERIAL OUANTITIES <br />Initial volume: 8 CCY <br />Loose volume: 9 LCY <br />Source of estimated volume: Opertor Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Swell factor: 1.165 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Pa. l�weight) Basis: <br />Material weight: 2,900 <br />Pounds/LCY <br />Description: Decomposed rock - <br />50% Rock, 50% Earth <br />Rated Payload: 27,280 <br />Pounds <br />Payload Capacity: 9.41 <br />LCY <br />CIRCES Cost Estimating Software <br />