Laserfiche WebLink
Public Notice <br /> <br />Mountain Coal Company, LLC (MCC), 5174 Highway 133, Somerset, CO 81434, <br />(970) 929-5015, has filed a complete application for Permit Revision No. PR-15 <br />to MCC’s Mining and Reclamation Permit No. C-1980-007 with the Colorado <br />Mined Land Reclamation Board (Board), under the provisions of the Colorado <br />Surface Coal Mining Reclamation Act of 1979. The permit was originally issued <br />by the Board in July 1981, and subsequently renewed in August 1986, January <br />1993 (effective August 1991), July 1996, Ju ly 2001, April 2007 (effective July <br />2006), and November 2011 (effective July 2011.) MCC is currently undergoing a <br />five-year permit renewal process that would extend the permit term to July 31, <br />2021. The West Elk Mine five-year permit area contains lands in Sections 9-11, <br />13-36, T13S, R90W, 6th PM; and Sections 23-26, T13S, R91W, 6th PM, and <br />Sections 1-5 , 8-12, T14S, R90W, 6th PM in Delta and Gunnison Counties. The <br />location of the lands can be found on the USGS 7.5 minute Somerset and <br />Minnesota Pass Quadrangle Topographic Maps. The current permit area <br />encompasses approximately 17,234.9 acres. <br /> <br />This Permit Revision is to expand the permit boundary by adding approximately <br />2,620 acres of MCC’s existing fee coal and private surface along with federal <br />coal within the modified federal coal leases COC-1362 & COC-67232, provide a <br />proposed area of projected longwall panels, as well as proposed MVB sites and <br />roads. <br /> <br />Copies of the permit revision application are available for review at the Colorado <br />Division of Reclamation, Mining, and Safety (CDRMS) office, Centennial <br />Building, 1313 Sherman Street, Room 215, Denver, Colorado, 80203, phone <br />(303) 866-3567, and the Gunnison County Planning Office, 221 N. Wisconsin, <br />Suite D, Gunnison, CO 81230. Comments or objections co ncerning the revision <br />application should be directed to the CDRMS at the above address not later than <br />30 days after the last date of publication of this notice in order to be considered.